§ 2.213 — Property Drainage
Code of the City of Grand Rapids, Michigan (Supp. No. 70: codified through Ordinance No. 2026-08, enacted April 14, 2026) · Grand Rapids City Code § 2.213
Corpus is an independent public-information project, not the official City of Grand Rapids website. Stable reference: corpuslaw.us/code/f44d0e98-422d-46fa-8b77-04c2f9c2d762
Sec. 2.213. - Property Drainage.
(1) Building Openings. (a) Any new construction or building undergoing substantial improvement in the base flood area of a swale, drainageway, floodway, ditch, culvert, or any other drainage facility or device shall strictly control the lowest building opening elevation so as to substantially limit flood damage to the building and its contents. (b) Except as provided herein, no building opening shall be constructed below the following elevations: 1. Flood Protection Elevation. 2. The lowest building opening elevation established at the time of the plat or development approval. 3. One (1) foot above the top of any downstream culvert. (c) Minimum elevation requirements described in Subsection (b) shall not apply to building openings that are outside the One Hundred-Year Floodplain, are not otherwise prohibited by any other federal, state, local regulation or law, and are: Located in an area east of the Grand River and bounded by South City limits (Hall Street extended); to Hall Street/Freeman Avenue intersection; to CSX railroad at Freeman Avenue; to Hayden Street/Woolsey Drive intersection; to Godfrey Avenue/B Street intersection; to Oakland Avenue/Rumsey Street intersection; to Oakland Avenue/CSX railroad crossing; to Wealthy Street/Ney Avenue; to Oakes Street/Grandville Avenue intersection; to Ionia Avenue/Cherry Street intersection; to Oakes Street/Commerce Avenue intersection; to Fulton Street/Ionia Avenue intersection; to Ottawa Avenue/Pearl Street intersection; to Newberry Street/Ionia Avenue intersection; to N. Division Avenue/Taylor Avenue/Coldbrook Street intersection; to Graceland Street/Riverside Drive intersection; to Guild Street/Coit Avenue intersection; to Briggs Boulevard/Monroe Avenue/North Park Street intersection; to Briggs Boulevard/4 Mile Road intersection; to the Grand River along the North City limit; or located in an area west of the Grand River and bounded by the south City limit near Veterans Memorial Drive; to Butterworth Street/West City Limit; to Butterworth Street/I-196 intersection; to Lake Michigan Drive/Fulton Street intersection; to Bridge Street/I-196 intersection; to Valley Avenue/6th Street intersection; to Van Buren Avenue/11th Street intersection; to Leonard Street/Lincoln Avenue intersection; to Webster Street/Powers Avenue intersection; to Tamarack Avenue/Richmond Street intersection; to Widdicomb Avenue/Thornapple Court intersection; to Ann Street/ Alpine Avenue intersection; to Nason Street/Turner Avenue along the North City Limit; to the Grand River along the North City limit. These provisions do not exempt such building from any other applicable local, state, or federal regulation, law or requirement. Any substantial improvement or construction permitted does not create a liability on the part of the City or any officer or employee thereof for any flood damage that results from compliance with or reliance upon the provisions of this ordinance. Any substantial improvement or construction is at the applicant's sole risk and the applicant shall defend, indemnify, protect, and hold harmless the City, its officers, agents, elected and appointed officials, departments, boards, and commissions from any and all claims, losses, liabilities, causes of action, demands, judgments, decrees, proceedings, and expenses of any nature (including, without limitation, attorneys' fees) arising out of or resulting from such substantial improvement or construction. Floods may occur at any time, and excessive flood water levels may be experienced due to manmade and natural causes, such as ice jams and accumulated debris in bridge openings. This provision does not imply that areas outside the One Hundred-Year Floodplain, or uses permitted within such areas, shall remain free from flooding or flood damages. (d) A waiver from complying with the lowest building opening elevation requirement in Section 2.213(1)(b) may be granted by the City Manager following receipt of a letter from a registered engineer, licensed with the State of Michigan, attesting that the proposed building opening elevation will not subject the building to a possible flood hazard from a base flood event. (e) Upon completion of construction of the structure's foundation and/or slab on grade, a registered land surveyor must certify any minimum building opening elevation specified by this ordinance. The certificate shall attest that the building opening elevation complies with the standards of this ordinance. The permittee for the building permit shall submit the certificate to the Building Inspections Supervisor prior to the commencement of framing and/or structural steel placement. If the surveyor should find that the minimum building opening elevation is below the elevation specified in Section 2.213(1)(b) and (d), that opening must be raised by using a method that meets with the approval of the City Manager. After reconstruction, a registered land surveyor or engineer must re-certify the minimum building opening elevation is compliant with the standards of this ordinance prior to the commencement of framing and/or structural steel placement. (2) Property Drainage. (a) Any drainage situation not involving water from public property or right-of-way is the responsibility of the property owner. (b) Lot grading and private property drainage is a civil matter among the property owners affected. (c) The City will provide technical advice to the property owner on drainage matters limited to advice only. (d) The drainage review of plats and site plans by the City is for the purpose of assuring that the property can be drained in accordance with the standards of this Code. Regardless of City approvals, the owner remains responsible for the drainage of their property and any impacts it may have on neighboring properties or the environment. (3) Post-Construction Stormwater Management Permit Requirement. This ordinance shall apply to all new development and redevelopment projects, including private and public projects that exceed the thresholds below or projects that are part of a larger common plan of development or sale that would cumulatively exceed the thresholds. (a) A property owner shall apply for and obtain a Stormwater Discharge Permit prior to the start of any construction, earth change, or other work on the project site for any of the following proposed land uses, development or redevelopment activities, property situations, or special circumstances: 1. A non-residential or Multi-family dwelling unit residential development or redevelopment project with an earth change involving an area of two thousand five hundred (2,500) square feet or more. 2. A plat, subdivision, Planned Unit Development, Planned Redevelopment District, Planned Industrial Development, Site Condominiums, Permitted with Approval Developments, Site Plan Review Development, Planned Redevelopment District, multi-family residential developments, or when otherwise required by the Planning Director, Planning Commission, or Board of Zoning Appeals. 3. A new or redeveloped parking area of one thousand (1,000) square feet or more. 4. When a permit is required by an Administrative Order: Notice of Violation (NOV), Corrective Action Notice or Order (CAO), or Consent Order. 5. Any work or obstruction within the City's right-of-way relating to development or redevelopment of property. 6. An earth change within five hundred (500) feet of a wetland, creek, stream, lake, water body or flood plain. 7. Any earth change regardless of development type involving an area of one (1) acre or more. 8. Individual single- and two-family residential lots are exempt from stormwater management permitting except where thresholds 6. and 7. above apply. (b) An application fee, as set forth by resolution of the City Commission, shall be paid for the review and processing of design plans and documents for the proposed drainage facilities that are submitted for obtaining a stormwater permit. (c) A permit fee, as set forth by resolution of the City Commission, shall be paid for administering and inspecting the proposed drainage facilities. (d) This permit shall be administered and enforced as a component of a consolidated application and permit called the Land Use and Development Permit required by Chapter 67 of the Code. (e) The City of Grand Rapids shall meet all standards of this ordinance and obtain an authorization to proceed with earth change for City projects exceeding the thresholds of this Section. (4) Industrial Stormwater Discharge Permit Requirement. (a) The property owner of existing and proposed development, redevelopment or transfer of an industrial property in the City that involves the drainage of surface runoff shall complete an Industrial Stormwater User Survey to determine if a City-issued industrial stormwater discharge permit is required for the site. New water service will not be initiated until a complete survey is submitted. In the case of a transfer account, water service will be disconnected if a complete survey is not submitted within ten (10) days of the transfer. If, upon review, the City Manager determines an initial site inspection may be required, the City will contact the property owner to schedule a site visit. The initial site visit will include assessment of the property for its potential to discharge pollutants into the CSDS. (b) The City Manager will evaluate the Industrial Stormwater User Survey and may schedule an initial site visit to determine the site's priority level within the Industrial Stormwater Program. (c) Stormwater dischargers who have previously submitted a survey, as prescribed in this Section, are also required to complete an Industrial Stormwater Survey periodically, at a frequency to be determined by the City Manager. (d) Within thirty (30) days after full evaluation and acceptance of the data furnished, the City Manager shall decide the site's priority level within the Industrial Stormwater Program and notify the property owner accordingly. (e) Permits will be effective for up five (5) years from the date of issuance as determined by their priority level.
(Ord. No. 2022-20, § 1, 7-26-22)
Ask a question about Grand Rapids law
Corpus searches the Grand Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.
