For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 142-84 — Contents of assembly permit

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 142-84

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/f52eedbe-7652-476b-95e4-925099af16cc

Sec. 142-84. - Contents of assembly permit.

In addition to those items set forth in section 142-13 above, if the assembly permit is granted, the permit must include, at a minimum: (a) The location by streets and/or parks of any assembling areas for the assembly; (b) The time at which units of the assembly will begin to assemble at the assembling area or areas, and the approximate conclusion time of the assembly; (c) The maximum length of the assembly in miles or fractions thereof; (d) The route to be traveled, turn by turn, and including the starting point and the termination point; (e) The portions of the streets to be traversed that may be occupied by the assembly; and (f) An attached map illustrating the exact route to be utilized by the assembly.

(Ord. No. 2009-04(08-O-2030), § 1, 1-31-09)

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.