§ 13.03.1308 — Large Industrial Users
Spokane Municipal Code; partial · SMC 13.03.1308 · Effective
Corpus is an independent public-information project, not the official City of Spokane website. Stable reference: corpuslaw.us/code/f5388a51-5cb9-4219-8514-dd112a97eefe
Section 13.03.1308 Large Industrial Users
A. Industrial users which contribute more than: 1. one hundred fifty thousand gallons (twenty thousand cubic feet) per day of wastewater flow, 2. three hundred sixty pounds of BOD per day, 3. two hundred ten pounds of SS per day, and/or 4. sixteen pounds of P per day, as an average for any seven days in each year, shall install approved wastewater flow metering, recording and totalizing equipment and refrigerated, proportional to flow, sampling equipment. B. If such industrial users do not supply approved monitoring facilities, they shall provide to the City every three months a report on wastewater loads for periods of normal operations based upon a minimum of seven days of flow proportioned sampling. 1. The report shall be prepared by an approved independent licensed engineer or approved independent laboratory.
Date Passed: Monday, October 15, 2007 Effective Date: Wednesday, November 28, 2007 Recodification ORD C34122 Section 1
Ask a question about Spokane law
Corpus searches the Spokane sections it holds and shows the ones that match, with their citations. Free, no sign-in.
