Section 12.02.0304 Permission Required
A utility or other entity or person proposing to install an underground utility vault shall first obtain permission from the director of engineering services. A. The director may require the submission of such plans and information as are deemed necessary. B. The director may make such inspections as desired and impose the fees provided in SMC 8.02.065(F). C. The director may impose conditions to issuance of permission or grant exception to this article as deemed necessary for the public health and safety.
Date Passed: Monday, June 25, 2007 Effective Date: Saturday, August 4, 2007 Recodification ORD C34053 Section 1
Ask a question about Spokane law
Corpus searches the Spokane sections it holds and shows the ones that match, with their citations. Free, no sign-in.