Sec. 45.6-6. - Technology zone incentives.
(1) Business professional and occupational license tax. Notwithstanding any other provision of the Norfolk City Code and pursuant to § 58.1-3850 of the Code of Virginia, 1950, as amended, any business that is certified as a qualified technology business shall be entitled to a reduction of its business, professional and occupational license tax imposed by Chapter 24, Article II-A of the Norfolk City Code against gross receipts derived from its technology business as follows:
(a) If the qualified technology business is a new technology business, then:
One hundred percent (100%) reduction in the calendar year during which the business is certified as a qualified technology business;
One hundred percent (100%) reduction in year two of certification;
Fifty percent (50%) reduction in year three of certification;
Fifty percent (50%) reduction in year four of certification; and
Fifty percent (50%) reduction in year five of certification.
(b) If the qualified technology business is a divested technology business, then:
One hundred percent (100%) reduction in the calendar year during which the business is certified as a qualified technology business, prorated as of the effective date of its certification as a qualified technology business;
One hundred percent (100%) reduction in year two of certification; and
One hundred percent (100%) reduction in year three of operation but only for such period of time that makes the total duration of the benefits afforded by this chapter to such divested technology business equal to two (2) years.
(c) If the technology business is an expansion technology business, then:
Fifty percent (50%) reduction in each business tax year for which the new jobs incentive threshold is met but in no event shall the benefits afforded to the expansion technology business be provided more than five (5) business tax years in any consecutive ten (10) year period after the business' initial application for certification.
(d) In no event shall the benefits afforded to a qualified technology business pursuant to this chapter 45.6 be greater than one hundred thousand dollars ($100,000.00) in any given year of certification, and a qualified technology business may not roll over any benefits which are in excess of such one hundred thousand dollars ($100,000.00) cap or which are not provided due to the five (5) year cap on expansion technology businesses to any successive years.
(2) Machinery and tools tax. Notwithstanding any other provision of the Norfolk City Code and pursuant to § 58.1-3850 of the Code of Virginia, 1950, as amended, any advanced manufacturing business that is not subject to business professional and occupational license tax and that is certified as a qualified technology business shall be entitled to a reduction of its machinery and tools tax imposed by section 24-3 of the Norfolk City Code against gross receipts derived from its technology business by an amount equal to the amount such qualified technology business would have received under section 45.6-6(1) above if it were subject to business professional and occupational license tax; provided, however, if such benefit amount is greater than the machinery and tools tax that would otherwise be payable by such qualified technology business, such excess amount may not be rolled over to any subsequent year, and in any event the benefits provided are subject to the limitation of section 45.6-6(1)(d) above.
(3) Planning, zoning and building permit fees waivers. Notwithstanding any other provision of the Norfolk City Code and pursuant to [Code of Virginia,] § 59.1-543, as amended, no qualified technology business as defined in this chapter shall be required to pay more than fifty (50) percent of the fee for obtaining planning, zoning and building permit fees required to undertake work on property located in the zone that is related to its technology business as follows:
(a) Building permit fee schedule:
i. Administrative fees waiver. Appeal to the board of building code appeals; re-inspection fee; changes or corrections to the application or approved plans; certificate of occupancy or certificate of compliance; and temporary C.O. for thirty (30) days.
ii. Building plan review fees waiver. New construction, alterations, and repairs; fire protection systems (includes all fire protection systems and alarms); and commercial fences, riprap, bulkheads, piers and similar accessory structures (includes signs, elevators, communication towers, pump stations, vaults).
iii. Building permit/inspection fees waiver. New construction (including additions), alterations, and repairs; demolition (any building or structure); hydraulic elevators; traction elevators; escalators/moving walkways; miscellaneous elevators (chair lifts, dumbwaiters, pneumatics, material lifts, etc.); commercial bulkhead and piers; re-roof and siding (commercial); and signs (new or alteration or modification of an existing sign).
iv. Electrical fees waiver. Electrical service (single-phase or three phases); and temporary release temporary electrical construction pole.
v. Mechanical fees waiver. Burner replacement; chiller; cooling tower/water tower; commercial hoods; condensate; hydronic piping; air conditioning equipment; boiler; combination unit; furnace; heat pump; space heater; replacement water heater; gas line; regulated equipment not addressed; air handler; commercial clothes dryer; kitchen cooking equipment; refrigerator equipment; dispenser; air distribution system; exhaust duct system; fan exhaust; make up air; fire/smoke dampers; fueling piping system; gas light; VAV box; ventilation duct system; and medical gas piping.
vi. Plumbing fees waiver. Plumbing equipment/fixtures/piping systems (indoor); plumbing site work (outdoor); backflow device; and sewer caps.
(b) Fee schedule for planning and zoning applications:
i. Architectural review board fees waiver. Certificate of appropriateness; and design review (under Norfolk City Code section 32-63).
ii. City planning commission fees waiver. Conditional use permit; rezoning/conditional rezoning; zoning text amendment; general plan amendment (with or without concurrent application); and development certificate (with or without waivers and right-of-way closures).
iii. Board of zoning appeals fees waiver. Variance/appeal; wetlands board/environmental; wetlands permit and land disturbance permit.
iv. Staff review/approval fees waiver. Ownership review request/buildable lot letter; zoning compliance letter; nonconforming zoning lot review (lots greater than 37.5 ft. in width); nonconforming zoning lot review (lots less than 37.5 ft. in width); site plan review (major); site plan review (minor); and moving storage container registration.
(Ord. No. 47,542, § 1, 2-26-19; Ord. No. 48,418, § 1, 6-22-21)