Sec. 4.82. - Permits and Specifications.

(1) No permit to build, rebuild or repair any sidewalk, driveway approach, retaining wall, curb, curb and gutter or areaway in the street right-of-way shall be issued to any person except a licensed Sidewalk Builder. (2) Before starting any work in the street right-of-way, the Sidewalk Builder shall take out a permit. Application for such permit shall: (a) Be accompanied by the permit fee as specified in the City Code or in the Sidewalk Rules and Regulations Permit Fee Schedule. (b) Be accompanied by a plan or sketch showing that the existing ground surfaces adjacent to and within limits of the public right-of-way shall be graded and/or excavated to conform to the established sidewalk grade on completion of the construction pursuant to the permit. Said plan or sketch shall show that a sloping grade beginning at the established sidewalk grade and sloping toward the curb or proposed curb line shall be maintained in order that surface waters shall run toward the street gutter or drainage ditch. The Engineer shall furnish line and grade stakes as may be necessary for proper location of the established sidewalk grade. The necessity for said plan or sketch may be waived by the Engineer. (c) No Building Permit for the construction or alteration of any building or structure shall be issued by the Inspection Services Department until the property owner has filed said plan or sketch. (3) All construction work in the public right-of-way requires a permit unless such work is covered by a City contract. (4) If any job or construction covered by this Chapter is started before a permit is obtained, an amount equivalent to Two Hundred (200) percent of the fee shall be paid before a permit is issued. (5) Permits shall be effective for a period of sixty (60) days. If the work is not completed within this time, the permit shall be null and void. Refunds or credits of permit fees will not be allowed. (6) Every sidewalk, driveway approach, curb, curb and gutter or areaway shall be built, rebuilt or repaired in accordance with the Grand Rapids Standard Construction Specifications and Sidewalk Rules and Regulations as approved by the City Commission. (7) A copy of the Sidewalk Rules and Regulations will be furnished to each licensee. Additional copies are available at One Dollar ($1.00) each. The Director is hereby authorized and directed to make and promulgate all necessary rules, regulations, plans and specifications for carrying out the design of this Chapter and to direct the proper construction of such work. Any neglect or refusal on the part of any person so building such structures to conform with such rules and regulations shall be deemed in violation of this Chapter and subject to the penalties provided. (8) Line and Grade Stakes. After a permit is issued, the Engineer shall, upon request of the Sidewalk Builder, furnish line and grade stakes as may be necessary for proper control of the work; but this shall not relieve the contractor of the responsibility of making careful and accurate measurements in constructing the work to the lines furnished by the Engineer. Stakes will normally be set within forty-eight (48) hours. When it is necessary to replace stakes disturbed or destroyed without fault of the City or its employees, a charge of Ten Dollars ($10.00) per stake shall be paid. (9) Valve Boxes and Cleanouts. When valve boxes, sewer cleanouts, hand-hole covers, gas valves, hydrants or other utility installations occur in sidewalks or driveway approaches, proper allowances must be made for these structures. Metal castings or frames shall be adjusted to the finished grade of the sidewalk surface. Concrete shall be kept far enough away from the covers so that they can easily be removed and replaced after the concrete has set. When a box is not perpendicular to the slab surface, the major portion of the box cover shall be set below the surface. When larger openings exist leading to underground chambers, the covers for these shall be set about one-half (½) inch higher than the average for drainage. In case of frames larger than six (6) inches across, standard sidewalk expansion joint material shall be placed on two (2) adjacent sides of square or rectangular frames and completely around circular frames. This material may be one-quarter (¼) inch thick, but not over one-half (½) inch thick. (10) Areaway Sidewalk. No person shall build any areaway or areaway sidewalk in any public right-of-way in the City until plans for same have been approved by the Engineer and permission has been granted by the City Commission. (a) Areaway walks must be constructed in accordance with the specifications for reinforced concrete sidewalks in the Grand Rapids Standard Construction Specifications and in the Sidewalk Rules and Regulations. (b) When an areaway is to be abandoned or the adjacent building demolished, the sidewalk shall be removed, the areaway backfilled and a new sidewalk constructed according to the Grand Rapids Standard Construction Specifications. (11) The City Manager or his or her designee shall establish the Sidewalk Rules and Regulations to carry out the purpose of this Chapter.

(Ord. No. 70-52, 7-28-70; Ord. No. 84-63, § 2, 9-11-84; Ord. No. 2016-80, § 1, 11-15-16)