For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.08.265 — Start of construction

San José Municipal Code (Supp. No. 5: codified through Ordinance No. 31341, enacted August 25, 2026) · San José Municipal Code § 17.08.265

Corpus is an independent public-information project, not the official City of San Jose website. Stable reference: corpuslaw.us/code/f7371ab1-6e6f-4b8f-9673-2c47e4d96619

17.08.265 - Start of construction.

"Start of construction" refers to the start of a substantial improvement or other proposed new development where the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement is within one hundred eighty days from the date of issuance of the building permit therefor. For the purposes of this section, the start of "substantial improvement" or "other proposes new development" mean: (a) the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, installation of piles, construction of columns, or any work beyond the stage of excavation; or (b) the placement of a manufacture home on a foundation; or (c) the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building. "Permanent construction," for the purposes of this section, does not include: (a) land preparation, such as clearing, grading, and filling; (b) the installation of streets and/or walkways; (c) excavation for a basement, footings, piers, or foundations or the erection of temporary forms; (d) the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure.

(Ord. 28512.)

Ask a question about San Jose law

Corpus searches the San Jose sections it holds and shows the ones that match, with their citations. Free, no sign-in.