Sec. 3003. - Prerequisites for Dockside Gaming Establishments.
(1) Licenses, permits: Before any building permit is approved for a dockside gaming establishment, the applicant shall present either a completed application for the intention of obtaining a license or a bona fide copy of a valid license from the Mississippi Gaming Commission.
(2) Master plan: All applicants in this zoning district shall be required to submit a master site development plan showing all proposed improvements, both waterborne and land-based. Master site development plan will include the following elements to insure compliance with all ordinances:
a. A site plan depicting the location of all improvements and facilities (i.e., location of all boats, barges, buildings, vessels, piers, parking lots, landscaping, etc.);
b. Photographs, artists' renderings, or other visual documents;
c. Information relative to the number; length, width, and height of all boats, barges, vessels and/or land-based structures;
d. The total number of employees contemplated, the number of patrons expected daily, monthly, yearly, and the expected peak traffic times and days, the hours of operation;
e. The number of parking spaces to be provided (in compliance with Article XXV. Off-street parking and loading), the layout, location, lighting, security, landscaping, construction details of same. If off-site parking is to be utilized, then the applicant will be required to supply copies of lease agreements and/or contracts committing specific parking spaces to the gaming facility, coupled with an acceptable shuttle bus or other appropriate plan to transport patrons and employees to/from the gaming facility;
f. Expected access routes to/from the gaming facility, and the expected traffic volumes;
g. Proposed road improvements and/or improvements to traffic controls, if any; Note: If the governing authority has involvement, that authority must be notified;
h. Expected infrastructure improvements such as water, sanitary sewer, natural gas, electricity, drainage, dredging, fire protection, if any. Such expected improvements shall be designed by an engineer or architect licensed in the State of Mississippi; Note: If the governing authority has involvement, that authority must be notified;
i. Proposed on-site security, etc.;
j. Details showing method by which vessels, barges, boats will maintain mooring while rising and falling with the river stages;
k. Evidence of site control (i.e., ownership or contractual right) for all lands included within the developer's proposal;
l. Details of all landscape buffer areas of sufficient length and width which are necessary to protect adjoining uses from any adverse impact such as noise, traffic, lights, etc., resulting from a gaming facility or its satellite and/or accessory structures.
(3) Application and/or expansions of permitted uses: The provisions and requirements of (2)a-1 above do not apply to any dockside gaming establishment for the construction of which a building permit was issued prior to the effective date of passage.