For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.10.330 — Permit not required

El Paso City Code (Supp. No. 95, Update 4: codified through Ordinance No. 019889, enacted June 23, 2026) · El Paso City Code § 15.10.330

Corpus is an independent public-information project, not the official City of El Paso website. Stable reference: corpuslaw.us/code/f85cfe50-2f08-40b8-a4d0-a15173795c91

15.10.330 - Permit not required.

A. Notwithstanding any other provision of this chapter, a permit is not required for: 1. Routine maintenance that does not require excavation or closing of sidewalks or vehicular lanes in a public right-of-way; 2. Replacing or upgrading a network node or node support pole with a node or pole that is substantially similar in size or smaller and that does not require excavation or closing of sidewalks or vehicular lanes in a public right-of-way; or 3. The installation, placement, maintenance, operation, or replacement of micro network nodes that are strung on cables between existing poles or node support poles, in compliance with the National Electrical Safety Code. B. For purposes of this section: 1. A network node or node support pole is considered to be "substantially similar" if: a. The new or upgraded network node, including the antenna or other equipment element, will not be more than ten percent larger than the existing network node, provided that the increase may not result in the network node exceeding the size limitations provided by Chapter 284; and b. The new or upgraded pole will not be more than ten percent higher than the existing pole, provided that the increase may not result in the pole exceeding the applicable height limitations prescribed by Chapter 284; 2. The replacement or upgrade does not include replacement of an existing node support pole; and 3. The replacement or upgrade does not defeat existing concealment elements of a node support pole. C. The determination under this section of whether a replacement or upgrade is substantially similar is made by measuring from the dimensions of the network node or node support pole as approved by the city. D. Notwithstanding the above, for activities that do not require a permit: 1. The provider shall give the city thirty days advance notice of the work described above; 2. A network provider may replace or upgrade a pole only with the approval of the pole's owner; and 3. The size limitations may not in any event exceed the parameters prescribed by Chapter 284 without the city's approval.

(Ord. No. 18717, § 1, 8-22-2017)

Ask a question about El Paso law

Corpus searches the El Paso sections it holds and shows the ones that match, with their citations. Free, no sign-in.