§ 18.67.030 — Submission of a waste management plan

Long Beach Municipal Code (Supp. No. 53, Update 1: codified through Ordinance No. ORD-26-0027, enacted October 13, 2026) · Long Beach Municipal Code § 18.67.030

Corpus is an independent public-information project, not the official City of Long Beach website. Stable reference: corpuslaw.us/code/f8d511b3-983d-4719-8a77-2bafa843daeb

18.67.030 - Submission of a waste management plan.

A. Applicants for construction or demolition permits involving a covered project shall complete and submit a WMP, on a WMP form approved by the City for this purpose, as part of the application packet for the construction or demolition permit. The completed WMP shall indicate all of the following: 1. The estimated volume or weight of the project C and D debris, by material type, to be generated; 2. The maximum volume or weight of such materials that can feasibly be diverted via reuse or recycling. No more than twenty percent (20%) of the sixty-five percent (65%) diversion rate can be achieved through the recycling or reuse of inert materials unless applicant can demonstrate to the satisfaction of the Director that sufficient structural materials do not exist for recycling or that forty-five percent (45%) diversion of total waste through non-inert materials is not feasible; 3. The vendor or facility where the applicant proposes to use to collect or receive that material; and 4. The estimated volume or weight of C and D debris that will be landfilled in Class III landfills. B. Calculating volume and weight of material. In estimating the volume or weight of materials identified in the WMP, the applicant shall use the conversion rates approved by the City for this purpose. C. Deconstruction. In preparing the WMP, applicants for demolition permits involving the removal of all or part of an existing structure shall consider deconstruction to the maximum extent feasible, and shall make the materials generated thereby available for salvage prior to landfilling. Deconstruction can be used to meet the sixty-five percent (65%) diversion requirement provided it is accounted for in the WMP.

(ORD-25-0019 § 1(Exh. A), 2025; ORD-22-0033 § 1(Exh. A), 2022; ORD-21-0040 § 8, 2021; ORD-19-0031 § 1(Exh. A), 2019; ORD-16-0026 § 1(Exh. A), 2016)