47-11. - Deferral of off-site improvements.
The Director of the Development Services Department may direct that construction of off-site improvements, or portions thereof, be deferred when such improvements are impractical or premature because of traffic conditions, unavailability of necessary right-of-way, the potential for creation of scalloped streets, or other conditions detrimental to orderly development, and/or because of the known and acknowledged formation or pending formation of an improvement district. Engineering plans for all off-site improvements shall be prepared, submitted and approved in accordance with Section 47-4.1, whether or not construction is deferred. Common infrastructure plans will not be required unless determined by the designated City Engineer to have a direct impact on the abutting off-sites, such as a bridge or railroad crossing on or adjacent to the parcel to be developed. Plans will include an analysis of drainage and establishment of grades on both sides of the roadway for a minimum of one-fourth (¼) mile beyond the project limits in each direction unless waived or reduced by the designated City Engineer. The developer of the property for which a deferral has been issued shall enter into an agreement with the City which shall be recorded to run with the land, and shall post an assurance as set forth below to guarantee the required improvements will be constructed when directed by the designated City Engineer. 47-11.1. Notice to proceed. The designated City Engineer will give written notice to proceed with the construction of the improvements previously deferred when necessitated by road condition, current or projected traffic, adjacent construction, or other conditions which require additional access. The developer shall start construction of such improvements within ninety (90) calendar days from the date of such notice and shall conclude such construction within a reasonable time, but in no event longer than one hundred eighty (180) days from the beginning of construction, in accordance with plans approved by the City. If the developer fails to construct any of the off-site improvements when directed, or fails to timely complete construction of the off-site improvements, the City may construct said improvements, or may complete construction of said improvements, and obtain payment therefor from the surety issuing the assurance. The developer's obligation will be satisfied when all required improvements have been constructed by the developer or another party, or when all required improvements have been constructed by an improvement district formed at the discretion of the City. 47-11.2. Performance bond. The designated City Engineer shall require the posting of performance bonds, letters of credit, assurances or such other security as may be appropriate and necessary to assure the installation of all off-site improvements whenever a deferral of construction has been issued or project phasing will permit occupancy of any structure prior to final acceptance of all improvements. Said security shall remain in full force and effect until such time as all required off-site improvements are constructed and accepted. In the case of projects which are divided into a number of large parcels subject to additional subdivision at a later time, only the major infrastructure necessary to serve all parcels and adjacent land shall be subject to these requirements. The form of the assurance must be acceptable to the City Attorney and will be in an amount fixed by the designated City Engineer. Receipt of an acceptable assurance will be required at the time of approval of improvement plans. 47-11.3. Partial construction. When it is impractical for the City to accept a financial assurance because the schedule for City improvements is undetermined or unreasonably far into the future, or if for any other reason the improvements are constructed by the developer, the designated City Engineer will order the construction of one (1) or both sides of sufficient roadway necessary to ensure an orderly traffic flow. The cost of construction of improvements beyond the center of abutting streets or beyond the property limits (other than tapers and other transitional items) shall be applied toward the amount of the developer's total obligation set forth in the benefit study, or the developer may enter into a reimbursement agreement with the City to recover costs from other developers as prescribed in Section 47-11.7 below. 47-11.4. Benefit study. The benefit study shall be utilized as the basis of determining a developer's full off-site improvement obligation. Use of the benefit study is required to ensure that the costs of the common infrastructure are equitably borne by all property owners in the subject study area. The amount and the purpose of the obligation for each property owner shall be stated in the benefit study subject to adjustment for inflation based on the ENR Construction Cost Index published by McGraw-Hill, Inc., and actual construction costs. When development occurs in areas which have not been included in benefit studies, the obligations will be estimated by the designated City Engineer or, at the developer's option, may be determined by a developer-funded benefit study. 47-11.5. Credit. When improvements are developer constructed, the developer will be credited for the improvements s/he constructs against the developer's obligation set forth in the benefit study. Improvements for which credit is applied must be those set forth in the benefit study, but need not be those specific obligations set forth for any particular property. Where possible, the credit will be established with physical quantities such as lineal feet of curb and gutter, square feet of asphalt, etc. Where physical quantities cannot be established, such as portions of railroad crossings, portions of canal improvements, etc., the obligation to be met shall be the estimated current value for the item as set forth in the benefit study. The benefit study analysis and determination of credit for work performed will be accomplished by the City's benefit study consultant at developer expense. If the improvements to be installed by the developer do not satisfy the full obligation of the property as set forth in the benefit study, the developer may: A. Install additional improvements, credited at values established by the benefit study as opposed to actual costs, up to the value of the developer's full obligation; B. Pay the cash differential which will be held in a trust account for use only for the designated improvements; or C. Provide an appropriate security, approved by the City Attorney, to guarantee construction of the remainder of the developer's obligation when determined necessary by the designated City Engineer as set forth in B. above. 47-11.6. City participation. When development occurs prior to initiation of City improvements, the City will not be obligated to participate in the developer's off-site construction costs; however, when funds budgeted for City participation in the developer's off-site improvements are available, the City Council may authorize the use of such funds to defray the developer's common infrastructure costs. The amount of such defrayal shall not exceed the amount of City participation set forth in the benefit study for the developer's property. 47-11.7. Reimbursement agreement. When the value of improvements constructed exceeds the developer's obligation as determined by the benefit study, the developer may be entitled to enter into a reimbursement agreement with the City to provide for recovery of costs from others who develop later on land adjacent to the streets constructed by such developer. In those cases where existing development will preclude property owner reimbursement, the City Council may authorize reimbursement from City funds subject to availability of funds. The designated City Engineer shall determine the amount of improvements eligible for reimbursement, and such determination shall be made a part of the agreement. Reimbursement shall be made on the basis of the benefit study. Procedures for establishing agreements and collection and payment of buy-ins shall be as set forth in Section 47-15.3.
(Ord. No. 2217, § 1, 4-25-91; Ord. No. 2672, § 3, 8-22-96; Ord. No. 3061, § 3, 11-18-99; Ord. No. 4365, § 12, 6-14-12; Ord. No. 4802, § 2(Exh., §§ 18, 19), 4-26-18)
Ask a question about Chandler law
Corpus searches the Chandler sections it holds and shows the ones that match, with their citations. Free, no sign-in.