Mystic River.
33 C.F.R. § 117.609
in effectEffective The draw of the S99 Alford Street Bridge, mile 1.4, shall open on signal; except that, Monday through Saturday, excluding holidays, the draw need not open for the passage of vessel traffic from 7:45 a.m. to 9 a.m., 9:10 a.m. to 10 a.m., and 5 p.m. to 6 p.m., daily. From November 1 through March 31, between 3 p.m. and 7 a.m., at least an eight-hour advance notice is required for bridge openings by calling the number posted at the bridge.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-33.xmlFetched: 7/26/2026
