§ 153.198. - Construction and bonding of large scale developments.
Provisions of section 153.138 of this chapter shall apply to the improvements for which a bond is required in a large scale development. However, the list of improvements for which a security is required for large scale developments is modified in this section. Security shall be required only for the phase or phases being constructed. Each phase shall be defined as submitted on the approved large scale development plan. Security shall be required for 110% of the estimated cost to complete the improvements that have not been completed and accepted prior to issuance of permits issued by the office of public works building and zoning department. Security is required for: (a) Public improvements, if required to serve the large scale development (to include such items as turn lanes within the public road, sidewalks, traffic signal systems when warranted, and any improvements necessary to meet the minimum requirements of section 153.112(a)(4)(c)); (b) Storm water detention (including the pond or detention storage system and the outlet control structure); (c) Erosion control system (to include silt fence, ditch checks, riprap, inlet protections, soil treatment/fertilizer/seed/mulch); (d) Private drive or private access easement when such private drive serves as the sole access to multiple lots or tracts.
(Ord. No. 264-07-12, § 1(Exh. A), 7-17-12; Ord. No. 109-03-19, § 1(Exh. A), 3-5-19)