Prequalification of contractors
A.R.S. § 41-2541
in effect41-2541. Prequalification of contractors
Prospective contractors may be prequalified for particular types of materials, services and construction. Prospective contractors have a continuing duty to provide the director with information on any material change affecting the basis of prequalification. Solicitation mailing lists of potential contractors shall include the prequalified contractors.
Source: Arizona State Legislature (azleg.gov)URL: https://www.azleg.gov/ars/41/02541.htmFetched: 10/31/2026
