Section 402. - Commercial or industrial—New construction, additions, and major remodels only.
A. Electrical permit fees for commercial or industrial construction, involving new construction only, shall be a total of the electric service fee, as determined in Subsection 404.A of this chapter, plus a base fee determined by the size of the construction designated below:
1—2,500 sq. ft. .....$293.00
2,501—10,000 sq. ft. .....$344.00
10,001—25,000 sq. ft. .....$562.00
25,001—50,000 sq. ft. .....$779.00
50,001—75,000 sq. ft. .....$997.00
75,001—100,000 sq. ft. .....$1,179.00
Each additional 5,000 sq. ft. .....$64.00
B. Electrical permit fees for commercial or industrial construction, involving additions, and major remodels only, shall be a total of the electric service fee (when required), as determined in Subsection 404.A of this chapter, plus a base fee determined by the size of the construction designated below:
1—2,500 sq. ft. .....$189.00
2,501—10,000 sq. ft. .....$207.00
10,001—25,000 sq. ft. .....$344.00
25,001—50,000 sq. ft. .....$476.00
50,001—75,000 sq. ft. .....$607.00
75,001—100,000 sq. ft. .....$745.00
Each additional 5,000 sq. ft. .....$64.00
Note: On remodel projects having less than fifty percent (50%) of the space in the area involved, the fees shall be as provided in Section 404 of this chapter.
(Ord. No. 24664, § 1, 8-25-2021; Ord. No. 25351, § 1, 7-17-2024)