§ 22.170.110 — Granting or denial of grading permits

Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.170.110

Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/fbcfe6bc-23dc-4446-b026-ee1b0f0c3b9b

22.170.110 - Granting or denial of grading permits

A. Granting 1. If the Director finds that an application for a grading permit complies with the requirements of this code and rules promulgated hereunder, that the fees specified in the Fee Subtitle have been paid, and that the applicant has satisfied all other conditions precedent imposed by or pursuant to this code, the Stormwater Code, and rules promulgated under those codes, the Director shall issue a permit to the applicant. A permit may be granted with or without conditions. Conditions may include, but are not limited to: restricting grading work to specific seasons, months or weather conditions; limiting vegetation removal; sequencing of work; requiring that recommendations contained in the geotechnical investigation are followed; requiring observation by a licensed civil or geotechnical engineer; requiring special inspection pursuant to Section 22.170.130; requiring structural safeguards; specifying methods of erosion, sedimentation, and drainage control; specifying methods for maintenance of slope stability; retaining existing trees; requiring revegetation and grass seeding and/or long term maintenance activities; requiring compliance with Chapter 25.09, Regulations for Environmentally Critical Areas, Chapter 23.60A, Shoreline Master Program, and other regulations of the City or other agencies with jurisdiction. 2. The Director may require that plans and specifications be stamped and signed by a licensed civil engineer or geotechnical engineer to indicate that the grading and proposed structure comply with the conclusions and recommendations of any required investigation or report. 3. Minimal risk. In geologic hazard areas and steep slope erosion hazard areas as identified in Chapter 25.09, the geotechnical/civil engineer who prepared the soils analysis and report may be required to submit a letter stating that: a. The plans and specifications conform to the recommendations of the soils analysis and report; and b. So long as conditions stated in the soils report are satisfied, areas disturbed by construction will be stabilized, the risk of damage to the proposed development or to adjacent properties from soil instability will be minimal, and the proposed grading and development will not increase the potential for soil movement. B. Denial. The application for grading permit may be denied if the Director determines that the plans or proposed activity do not comply with the requirements of this code and rules promulgated hereunder, or do not accomplish the purposes of this code, or the grading or other land disturbing activity is inconsistent with the proposed development on the site, or the plans or other proposed activity do not comply with other applicable federal, state and local laws and regulations, or that the applicant has failed to satisfy any condition precedent to issuance of the permit imposed by or pursuant to this code, the Stormwater Code or rules promulgated under either code. C. Limitations. The issuance or granting of a grading permit shall not be construed to be permission for, or an approval of, any violation of any of the provisions of this code or rules promulgated hereunder, or of any other law or regulation. A grading permit does not remove the need to obtain any other permit or approval required under any other law, ordinance or regulation.

(Ord. 126357, § 6, 2021; Ord. 124105, § 6, 2013; Ord. 123107, § 1, 2009.)