For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 56.008 — Use of alternative materials, designs, and methods; exceptions; modifications

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 56.008

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/fbf0b99c-a90f-4ac8-812a-151145470569

Sec. 56.008. - Use of alternative materials, designs, and methods; exceptions; modifications.

(a) The Building Official may authorize the use of alternative materials, designs or methods of construction, provided the material, design or method is, for the purpose intended, the equivalent in suitability, strength, effectiveness, fire resistance, durability, safety and sanitation to the materials, designs or methods prescribed by the Building Code and the use otherwise complies with the provisions of the Building Code. Any person seeking to use alternative materials, designs or methods shall first establish to the satisfaction of the Building Official that the alternative materials, designs or methods are equivalent to those prescribed by the Building Code. The Building Official shall document, in writing, the details of the approval of any such alternative materials, designs or methods prior to the issuance of a building permit. (b) The Building Official may authorize exceptions to the Building Code, if the Building Official determines that there are substantial practical difficulties in carrying out the provisions of the Building Code, that the exception does not lessen any fire protection requirement or lessen the structural integrity of the building, and the proposed construction will satisfy the intent and purpose of the Building Code. The Building Official shall document in writing that the exception meets the criteria set forth in this subsection prior to the issuance of a building permit. (c) If the Building Official determines that an applicant has provided insufficient evidence to authorize the use of any alternative material, method or design, or to support the exception, the Building Official shall deny the request for the use of the alternative material, method or design, or the exception, or may require tests prior to making the determination, to be made at the applicant's sole cost and expense. Any such test shall be performed by a testing agency approved by the Building Official. Reports of such tests shall be retained by the Building Official for the period required for the retention of such public records.

(Prior Code, § 56.008; Ord. No. 62-05)

Ask a question about Salem law

Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.