§ 601.070 — Provisions for flood hazard reduction
Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 601.070
Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/fce8e3fe-9727-409f-9dda-6830ea85bf85
Sec. 601.070. - Provisions for flood hazard reduction.
(a) General standards. In all SFHAs, the following standards shall be adhered to: (1) Alteration of watercourses. Require that the flood carrying capacity within the altered or relocated portion of said watercourse is maintained. Require that maintenance is provided within the altered or relocated portion of said watercourse to ensure that the flood carrying capacity is not diminished. Require compliance with SRC 601.040(d) and SRC 601.040(e). (2) Anchoring. (A) All new construction and substantial improvements shall be anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (B) All manufactured dwellings shall be anchored per SRC 601.075(c)(4). (3) Construction materials and methods. (A) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage (B) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage. (4) Water supply, sanitary sewer, and on-site waste disposal systems. (A) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system. (B) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharge from the systems into flood waters. (C) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding consistent with the Oregon Department of Environmental Quality. (5) Electrical, mechanical, plumbing, and other equipment. Electrical, heating, ventilating, air-conditioning, plumbing, duct systems, and other equipment and service facilities shall be elevated no less than one foot above the base flood elevation and shall be designed and installed to prevent water from entering or accumulating within the components and to resist hydrostatic and hydrodynamic loads and stresses, including the effects of buoyancy, during conditions of flooding. In addition, electrical, heating, ventilating, air-conditioning, plumbing, duct systems, and other equipment and service facilities shall, if replaced as part of a substantial improvement, meet all the requirements of this section. (6) Tanks. (A) Underground tanks shall be anchored to prevent flotation, collapse and lateral movement under conditions of the base flood. (B) Above-ground tanks shall be installed no less than one foot above the base flood elevation or shall be anchored to prevent flotation, collapse, and lateral movement under conditions of the base flood. (7) All new construction and substantial improvements shall be located no closer than 15 feet to the waterway centerline, or ten feet to the top of a recognizable bank, whichever is greater, except that this provision shall not apply to the Willamette River floodplain. (b) Subdivision proposals and other proposed developments. (1) All new subdivision proposals and other proposed new developments (including proposals for manufactured dwelling parks and subdivisions) greater than 50 lots or five acres, whichever is the lesser, shall include within such proposals, Base Flood Elevation data. (2) All new subdivision proposals and other proposed new developments (including proposals for manufactured dwelling parks and subdivisions) shall: (A) Be consistent with the need to minimize flood damage; (B) Have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize or eliminate flood damage; and (C) Have adequate drainage provided to reduce exposure to flood hazards. (c) Use of other base flood data. (1) When Base Flood Elevation data has not been provided in accordance with SRC 601.030(a) the local floodplain administrator shall obtain, review, and reasonably utilize any Base Flood Elevation data available from a federal, state, or other source, in order to administer SRC 601.070 All new subdivision proposals and other proposed new developments (including proposals for manufactured dwelling parks and subdivisions) must meet the requirements of SRC 601.070(b). (2) Base Flood Elevations shall be determined for development proposals that are five acres or more in size or are 50 lots or more, whichever is lesser in any A zone that does not have an established base flood elevation. Development proposals located within a riverine unnumbered A Zone shall be reasonably safe from flooding. The test of reasonableness includes, but is not limited to, the use of historical data, high water marks, FEMA provided Base Level Engineering data, and photographs of past flooding, where available. Failure to elevate at least two feet above grade in these zones may result in higher insurance rates. (d) Structures located in multiple or partial flood zones. (1) In coordination with the State of Oregon Specialty Codes: (A) When a structure is located in multiple flood zones on the community's Flood Insurance Rate Maps (FIRM) the provisions for the more restrictive flood zone shall apply. (B) When a structure is partially located in a SFHA, the entire structure shall meet the requirements for new construction and substantial improvements.
(Ord. No. 17-19, § 2(Exh. A), 10-14-2019; Ord. No. 8-20, § 1(Exh. A), 9-28-2020)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.
