For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 92.12 — Inspection

Saint Paul Legislative Code (Supp. No. 133, Update 1: codified through Ordinance No. 26-26, adopted May 13, 2026) · Saint Paul Legislative Code § 92.12

Corpus is an independent public-information project, not the official City of St. Paul website. Stable reference: corpuslaw.us/code/fd2a44e9-ae64-4718-8a56-2d83861c6811

Sec. 92.12. - Inspection.

(a) The board will cause all work reported to be inspected. The plumber or person doing work on their own residence will be notified of any work which has not been done in accordance with the water code, and they will be required to remedy the same. (b) In all new installations, the plumber must leave the work exposed until such time as an inspection has been made and the work approved. This includes all exterior service pipe, which must be inspected before back filling the trench, and all interior piping which must be inspected and tagged "approved" by the inspector after it has been roughed in and before it is covered over or concealed in the floors or partitions. The plumber shall give due and sufficient notice when inspection is desired, and shall call for inspection only when the work is in proper condition and stage of completion. (c) Water will not be turned on until after the report of such an inspection has been made and the work accepted as satisfactory.

(Code 1956, § 235.15; C.F. No. 93-905, § 26, 7-15-93; C.F. No. 07-1048, § 6, 11-28-07)

Ask a question about St. Paul law

Corpus searches the St. Paul sections it holds and shows the ones that match, with their citations. Free, no sign-in.