Sec. 22-98. - Application for heliport permit; contents.
Each application for a heliport permit, as required by this division, shall contain the following:
(1) If the proposed heliport site is a rooftop, a report by a licensed professional engineer, registered in the state, approved by the director of the planning and development department, showing that the roof structure is designed to support concentrated loads, on any one square foot, equivalent to three-fourths gross weight of the largest helicopter to be accommodated.
(2) A statement, approved by the director of the planning and development department that where roofs lack the complete protection of a parapet of adequate height, a guard rail, to a minimum height of three feet, where necessary, will be provided.
(3) A statement of the type of helicopter operations, for example, IFR, VFR, or both, and types of helicopters to be used, and their maximum gross weight as set by the Federal Aviation Agency.
(4) A plan of proposed heliport site, showing dimensions of entire usable areas, dimensions of actual landing and takeoff areas, all obstructions and emergency landing areas within 1,000 feet of the heliport, with scale drawings of the same, indicating their heights in proportion to the heliport landing area. If the heliport is to be located on a rooftop, its distance above ground level must be given.
(Code 1971, § 8-28)