For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 535.06 — Fees and Charges

Codified Ordinances of the City of Cleveland, Ohio (2026 S-28: current through legislation passed October 19, 2026) · Codified Ordinances of Cleveland § 535.06

Corpus is an independent public-information project, not the official City of Cleveland website. Stable reference: corpuslaw.us/code/fdec2692-ea8e-4813-8fad-16b34028d786

§ 535.06 Fees and Charges

For all fees and charges listed in this section, if the size is not listed, the fee will be assessed based on the next size larger on the schedule. (a) Account Setup.* Tap Connection | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 Tap Connection | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 1 in. or smaller | $248 | $253 | $261 | $270 | $278 | $287 1-1/2 in. | $518 | $529 | $546 | $564 | $582 | $601 2 in. | $1,283 | $1,311 | $1,354 | $1,397 | $1,442 | $1,488 4 in. | $1,647 | $1,683 | $1,737 | $1,793 | $1,850 | $1,910 6 in. | $1,733 | $1,771 | $1,828 | $1,887 | $1,947 | $2,010 8 in. | $1,949 | $1,992 | $2,056 | $2,122 | $2,190 | $2,261 10 in. | $2,320 | $2,371 | $2,447 | $2,526 | $2,607 | $2,691 12 in. | $3,248 | $3,320 | $3,426 | $3,536 | $3,650 | $3,767 16 in. | $4,344 | $4,440 | $4,583 | $4,730 | $4,882 | $5,039 * Prices assume tap is a ductile iron pipe. For concrete pipe, a fifty-five percent (55%) surcharge shall be added. (b) Direct Tap / Tapping Sleeve Installation Fee.* Tap / Connection | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 Tap / Connection | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 1 in. or smaller | $187 | $191 | $197 | $203 | $210 | $217 1-1/2 in. | $394 | $401 | $414 | $428 | $441 | $456 2 in. | $973 | $992 | $1,024 | $1,057 | $1,091 | $1,126 4 in. | $1,248 | $1,272 | $1,313 | $1,355 | $1,399 | $1,444 6 in. | $1,313 | $1,338 | $1,381 | $1,426 | $1,472 | $1,519 8 in. | $1,477 | $1,505 | $1,554 | $1,604 | $1,655 | $1,708 10 in. | $1,758 | $1,792 | $1,850 | $1,909 | $1,971 | $2,034 12 in. | $2,461 | $2,509 | $2,589 | $2,673 | $2,758 | $2,847 16 in. or larger (deposit + cost)** | $3,293 | $3,357 | $3,465 | $3,576 | $3,691 | $3,801 * Prices assume tap is a ductile iron pipe. For concrete pipe, a fifty-five percent (55%) surcharge shall be added. ** Fee listed is a deposit; actual final cost of labor and materials shall be assessed to customer. (c) New Connection Rescheduling Fee (if not cancelled 24 hours prior to appointment). 2024 | 2025 | 2026 | 2027 | 2028 | 2029 $141 | $152 | $158 | $164 | $170 | $176 (d) Curb Valves. Fee includes labor for installation only. Excavation, sheeting, testing, and restoration are the customer's responsibility. Curb Valves | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 Curb Valves | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 1-1/2 in. | $192 | $192 | $192 | $194 | $201 | $207 2 in. | $192 | $192 | $192 | $194 | $201 | $207 3 in. | $384 | $384 | $384 | $388 | $402 | $414 4 in. | $384 | $384 | $384 | $388 | $402 | $414 6 in. | $384 | $384 | $384 | $388 | $402 | $414 8 in. | $384 | $384 | $384 | $388 | $402 | $414 10 in. | $576 | $576 | $576 | $582 | $603 | $621 12 in. | $576 | $576 | $576 | $582 | $603 | $621 (e) Plugging Connections. Fee only includes actual plugging of connection. Excavation and restoration shall be invoiced at cost to the customer. Plugging Connections | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 Smaller than 2 in. | $2,205 | $2,830 | $2,915 | $3,003 | $3,094 | $3,187 2 in. to 12 in. | $2,939 | $3,764 | $3,877 | $3,994 | $4,115 | $4,239 Larger than 12 in. | $3,673 | $4,726 | $4,868 | $5,015 | $5,167 | $5,322 Connection Containment | $210 | $216 | $223 | $229 | $236 | $243 Connection Reinstatement | $155 | $161 | $168 | $174 | $181 | $189 (f) Assembling Meter Settings for Vault Meters. Fee includes labor only. Meter Size | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 Meter Size | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 1-1/2 in. | $348 | $348 | $348 | $357 | $369 | $381 2 in. | $348 | $348 | $348 | $357 | $369 | $381 3 in. | $348 | $348 | $348 | $357 | $369 | $381 4 in. | $452 | $452 | $452 | $464 | $480 | $495 6 in. | $1,018 | $1,018 | $1,018 | $1,049 | $1,083 | $1,119 8 in. | $1,318 | $1,318 | $1,318 | $1,357 | $1,401 | $1,448 10 in. | $1,677 | $1,677 | $1,677 | $1,728 | $1,784 | $1,842 12 in. | $2,037 | $2,037 | $2,037 | $2,098 | $2,166 | $2,237 (g) Install / Replace Meters. Meter Size | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 1 in. or smaller - Inside Setting | $344 | $354 | $362 | $370 | $378 | $387 1 in. or smaller - Vault Setting | $391 | $400 | $409 | $418 | $428 | $439 1-1/2 in. - Inside Setting | $577 | $603 | $614 | $625 | $636 | $648 1-1/2 in. - Vault Setting | $577 | $603 | $614 | $625 | $636 | $648 2 in. | $646 | $659 | $670 | $681 | $692 | $704 3 in. | $1,489 | $1,597 | $1,630 | $1,663 | $1,697 | $1,733 4 in. | $1,561 | $1,684 | $1,717 | $1,750 | $1,784 | $1,820 6 in. | $2,579 | $2,581 | $2,627 | $2,675 | $2,724 | $2,774 8 in. | $2,984 | $3,231 | $3,277 | $3,325 | $3,374 | $3,424 10 in. | $3,684 | $4,031 | $4,077 | $4,125 | $4,174 | $4,224 12 in. | $4,829 | $5,646 | $5,692 | $5,740 | $5,789 | $5,839 2 in. Compound | $2,189 | $2,311 | $2,357 | $2,405 | $2,454 | $2,504 3 in. Compound | $2,154 | $2,514 | $2,557 | $2,605 | $2,654 | $2,704 4 in. Compound | $2,744 | $2,771 | $2,817 | $2,865 | $2,914 | $2,964 6 in. Compound | $3,504 | $3,681 | $3,727 | $3,775 | $3,824 | $3,874 8 in. Compound | $5,029 | $5,881 | $5,927 | $5,975 | $6,024 | $6,074 10 in. Compound | $7,705 | $9,270 | $9,316 | $9,364 | $9,413 | $9,463 12 in. Compound | $12,402 | $15,188 | $15,234 | $15,282 | $15,331 | $15,381 Specialty meter (labor costs only - meter hardware involved at actual cost) | $3,000 | $3,000 | $3,000 | $3,000 | $3,000 | $3,000 Endpoint | $128 | $105 | $108 | $111 | $115 | $118 Transmitter Wire | $50 | $10 | $11 | $11 | $11 | $11 (h) Assembling Regulator Setting. Fee includes labor for assembling setting only. Material, material delivery, excavation, sheeting, transporting the assembly, testing, installation, and restoration are the customer’s responsibility. Regulator Size | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 8 in. | $1,681 | $1,726 | $1,782 | $1,839 | $1,898 | $1,959 12 in. | $2,800 | $2,883 | $2,975 | $3,071 | $3,170 | $3,271 (i) Regulator Controls Setup. Fee includes labor for installation only. Excavation, sheeting, testing, and restoration are the customer’s responsibility. Regulator Size | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 8 in. | $1,681 | $1,726 | $1,782 | $1,839 | $1,898 | $1,959 12 in. | $2,800 | $2,883 | $2,975 | $3,071 | $3,170 | $3,271 (j) Water Use from Hydrants and Other Unmetered Sources. | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 Permit | $66 | $73 | $76 | $80 | $84 | $88 Volume Charge ($/MCF/Service Area) | Charged at additional MCF rate in applicable rate district where hydrant is located Meter/Valve/BF Assembly Refundable Deposit | $1,450 | $1,475 | $1,500 | $1,525 | $1,550 | $1,575 Meter Rental Fee First Week | $48 | $53 | $56 | $59 | $62 | $65 Meter Rental Fee Each Week After | $34 | $38 | $40 | $42 | $44 | $46 (k) Miscellaneous Engineering Services. | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 Minimum (for engineering services | $61 | $67 | $69 | $71 | $73 | $76 Plan reviews - plan and profile drawing containing water work (per foot, 50-foot minimum) | $1.22 | $1.33 | $1.37 | $1.42 | $1.46 | $1.51 Deposit for proper submittal of customer created As-Builts - fully refundable when approved. As-Builts received within 180 days of main going into service (per foot, 50-foot of water main minimum.) | $10 | $10 | $10 | $10 | $10 | $10 As-Built processing fee - plan profile drawing containing water work (per foot) | | | | | | Hard or paper copy | $0.70 | $0.70 | $0.70 | $0.70 | $0.70 | $0.70 GIS format per CWD | | | | | | Standards | $0.07 | $0.07 | $0.07 | $0.07 | $0.07 | $0.07 Backflow prevention testing fee - CWD processing fee* | $18 | $19 | $20 | $21 | $22 | $23 Additional review due to plan change without prior approval (per hour) | $58 | $59 | $60 | $61 | $62 | $63 * Backflow prevention testing fee - These are direct Cleveland Water Division costs for managing the backflow program. Additional fees charged by the Cleveland Water Division’s backflow vendor will shall also be passed on charged to the customer. (l) Disinfection of Water Mains.* | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 4 in. | $0.78 | $0.81 | $0.84 | $0.87 | $0.91 | $0.95 6 in. | $0.78 | $0.81 | $0.84 | $0.87 | $0.91 | $0.95 8 in. | $1.02 | $1.06 | $1.10 | $1.14 | $1.18 | $1.23 10 in. | $1.02 | $1.06 | $1.10 | $1.14 | $1.18 | $1.23 12 in. | $1.22 | $1.27 | $1.32 | $1.37 | $1.42 | $1.47 16 in. | $1.35 | $1.40 | $1.45 | $1.51 | $1.57 | $1.63 20 in. or greater (deposit + cost) | $4,160 | $4,310 | $4,470 | $4,630 | $4,800 | $4,970 Service Fee** | $480 | $500 | $520 | $540 | $560 | $580 * 1,200-foot minimum. ** Service is charged each time the disinfection crew has to set up its equipment/trip. (m) Meter Inspections / Meter Tests at Customer Request. | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 1 in. or smaller | $135 | $135 | $135 | $138 | $143 | $147 1-1/2 in. to 4 in. | $270 | $270 | $270 | $276 | $286 | $294 Larger than 4 in. | $540 | $540 | $540 | $552 | $572 | $588 (n) Special Service Calls. 2024 | 2025 | 2026 | 2027 | 2028 | 2029 $48 | $48 | $49 | $51 | $53 | $54 (o) Special Service Calls – Expedited. 2024 | 2025 | 2026 | 2027 | 2028 | 2029 $96 | $96 | $99 | $102 | $105 | $109 (p) Appointment Broken by Customer. 2024 | 2025 | 2026 | 2027 | 2028 | 2029 $42 | $43 | $44 | $45 | $46 | $47 (q) Returned Check (per check). 2024 | 2025 | 2026 | 2027 | 2028 | 2029 $34 | $34 | $34 | $34 | $34 | $34 (r) Tampering. | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 First Incident | $250 | $250 | $250 | $250 | $250 | $250 Second Incident | $2,300 | $2,300 | $2,300 | $2,300 | $2,300 | $2,300 Each Incident thereafter | $3,700 | $3,700 | $3,700 | $3,700 | $3,700 | $3,700 (s) Lab Testing. | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 Bacteria Colilert - 18 | $23 | $23 | $23 | $23 | $23 | $23 Bacteria Ecoli for LT2 | $24 | $24 | $24 | $24 | $24 | $24 Halo Acetic Acids 552.2 | $151 | $151 | $151 | $151 | $151 | $151 Metals | $112 | $112 | $112 | $112 | $112 | $112 Total Organic Carbon | $25 | $25 | $25 | $25 | $25 | $25 Ion Chromatography * | $63 | $100 | $100 | $100 | $100 | $100 Trihalomethanes 524.2 | $45 | $75 | $75 | $75 | $75 | $75 Total Microcystins ELISA-ADDA | $34 | $100 | $100 | $100 | $100 | $100 Total Microcystins ELISA-ADDA follow-up sample ** | $700 | $700 | $700 | $700 | $700 | $700 Quantitative Polymerase Chain Reaction (aPCR) *** | $250 | $250 | $250 | $250 | $250 | $250 General Wet Chemistry **** | $50 | $50 | $50 | $50 | $50 | $50 * Includes fluoride, phosphate, bromide, chloride, nitrate, nitrite, and sulfate. ** Resample and repeat samples following a routine sample detection (price per day of sampling). *** aPCR screening for cyanobacteria and cyanotoxin gene detection meeting Ohio EPA analytical requirements. **** Includes pH, alkalinity, hardness, free and total chorine residual, and turbidity. (t) Private Fire Protection Charges. Fire Line Size | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 Fire Line Size | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 1-1/2 in. | $17.15 | $17.71 | $18.04 | $18.09 | $18.53 | $18.75 2 in. | $17.15 | $17.71 | $18.04 | $18.09 | $18.53 | $18.75 3 in. | $17.15 | $17.71 | $18.04 | $18.09 | $18.53 | $18.75 4 in. | $46.60 | $48.13 | $49.02 | $49.15 | $50.35 | $50.96 6 in. | $67.20 | $69.41 | $70.69 | $70.87 | $72.61 | $73.48 8 in. | $119.95 | $123.89 | $126.18 | $126.51 | $129.60 | $131.17 10 in. | $187.80 | $193.96 | $197.55 | $198.07 | $202.92 | $205.36 12 in. | $256.35 | $264.76 | $269.66 | $270.36 | $276.98 | $280.32 (u) The fees and charges are effective beginning January 1 of each year. (v) The Commissioner may enter into payment arrangements for installment payments of the fees and charges contained in this section or in Section 535.23 and Section 535.24 when determined to be reasonable by the Commissioner. Failure to make any payment under an arranged payment plan when due shall cause the total unpaid amount to become payable on demand and may lead to termination of water service. (Ord. No. 446-2024. Passed 6-3-24, eff. 7-3-24) (BOC Res. No. 347-24. Adopted 7-24-24)

Ask a question about Cleveland law

Corpus searches the Cleveland sections it holds and shows the ones that match, with their citations. Free, no sign-in.