§ 27-30 — Contents of permit for excavation; fee

Code of Ordinances, City of Burlington, Vermont (Current through Ord. 8-3-26, passed August 3, 2026) · Burlington Code of Ordinances § 27-30

Corpus is an independent public-information project, not the official City of Burlington website. Stable reference: corpuslaw.us/code/fe40f6ff-56b5-40a2-9540-2d67129a39e8

27-30 Contents of permit for excavation; fee.

(a) Application for a street excavation permit or for improvements to unimproved portions of the public right-of-way shall be made on forms furnished by the city. (b)(1) The fee for an excavation or improvement permit, payable in advance, is as follows unless otherwise the subject of an express agreement with the city: a. An administration and inspection charge of seventy cents ($0.70) per square foot for all excavations anywhere within the right-of-way; plus b. A damages charge of ten dollars ($10.00) per square foot of excavation occurring within the paved portion of the right-of-way; plus c. A damages charge of one dollar ($1.00) per square foot of excavation occurring within the greenbelt or sidewalk portions of the right-of-way. The fee shall be based upon information supplied to the director of public works or his or her designee by the excavator at the time of application and as verified by the city inspector. The fee shall be annually adjusted July 1, 1987, and each July 1 thereafter to reflect any change in the consumer price index for that preceding year. (2) Whenever a service pipe between a water or sewer main and an owner’s premises is repaired or renewed, the permit fee attributable to excavations from such work shall be cost-allocated as an operating expense of the system and shall be included in the general water and wastewater rates, respectively, and not billed directly to the owner of the premises. (c) The fee for excavation or improvement permits may be doubled if work is commenced prior to obtaining a permit. Paying double fees does not waive other penalties. This subsection shall not apply to emergency excavations as defined in section 27-29(d). (d) Generally, a permit shall cover only contiguous construction and work performed as one continuous operation, except as otherwise determined by the director of public works or his or her designee. Notwithstanding the preceding sentence, where a continuous and single operation involves separate excavation by a single excavator, no more than two (2) such excavations shall be covered by a single permit, provided such single permit shall be allowed only where the distance between the excavations shall not be greater than twenty (20) feet at their opposite extremities. Additionally, where an operation includes jacking or boring requiring excavation on each side of a public way, only one permit shall be required for such excavations, provided such jacking or boring shall not accommodate a conduit larger in diameter than six (6) inches. (e) A permit shall expire for work not started within seven (7) days or completed within thirty (30) days after issuance of a permit, and a new permit shall be required before beginning or completing the work, unless otherwise approved by the director of public works or his or her designee. (f) A permit shall contain a commencement date and estimated date of completion. "Completion date," as used in this section, means the date upon which the permanent pavement resurfacing is finished and accepted by the director of public works or his or her designeee. (g) (1) Whenever the city has developed an annual work program for the reconstruction of city streets, the director of public works or his or her designee shall send written notice thereof to all abutting property owners and to all departments, utilities or others which have pipes, wires, cables, conduits or other such facilities beneath the surface of the streets to be reconstructed. Such notice of the annual street reconstruction program shall be sent no later than April 15. (2) For the purposes of this section, "street reconstruction" shall mean: a. The recycling and relaying of existing material; b. The complete removal of old surface material and the laying of new material; or, c. Resurfacing of existing surface material with new material in excess of one (1) inch thickness. (3) Upon receipt of the notice of the annual street reconstruction program, such person, department or utility shall have not more than sixty (60) days to complete any subsurface work contemplated, or, if an extension of time is needed, shall obtain a subsurface work schedule approved by the director of public works or his or her designee. If an applicant objects to the subsurface work schedule required by the director of public works or his or her designee, the review and approval may be sought from the public works commission. (4) If subsurface work is done in accordance with subsections (g)(1) through (g)(3) above, the applicant shall pay only the fee for administration and inspection for that portion of the excavation area which will be reconstructed. (h) When sidewalk excavation results in complete replacement by the excavator of the entire length of a city block or city street, or is undertaken so as to replace or improve existing sidewalk along the entire boundary of the abutting property, the applicant shall pay only the administration and inspection fee for such excavation.

(Ord. of 1-18-82; Ord. of 3-19-84; Ord. of 3-10-86; Ord. of 5-18-20)