§ 509.850 — Location of; specifications for installations
Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Code of Ordinances § 509.850
Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/ffcb9932-d9a9-4ecc-bdcf-a56f136f101d
509.850. - Location of; specifications for installations.
(a) Water meters shall be located and installed as follows: (1) All water meters shall be set at the point the water service line enters the building. No plumbing connections shall be made prior to the meter. Water meters shall be set in such a manner as to be easily accessible for servicing, removal, and resetting. No water service line within a building ahead of a water meter shall be concealed, except it may be run beneath the lowest floor in the building in accordance with the applicable building code. If the water service line is run beneath the floor, the meter shall be set at the location where the line emerges from the floor. (2) Meter set materials and configuration shall be according to the city standards. (3) Couplings and valves shall not be subjected to immersion by ordinary back flooding of the building drainage. (b) Whenever a condition exists that impedes the servicing, removal, or setting of a water meter, the person(s) whose name(s) appear(s) on the current billing records shall be mailed a notice to correct such conditions. Unless the condition is corrected within fifteen (15) days, the city may shut off the water and the water may remain shut off until the condition is corrected, and all fees and costs are paid. (c) Whenever a water service line to a building is replaced, the water meter shall be installed in accordance with the provisions of this article.
(Ord. No. 2022-024, § 4, 5-26-22)
Ask a question about Minneapolis law
Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
