For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.865.100 — Approval Criteria

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.865.100

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/ffed5158-7e8c-4d28-8d8e-e194d4b58d5a

33.865.100 Approval Criteria.

Requests for a River Review will be approved if the review body finds that the applicant has shown that all applicable approval criteria have been met. A. Development within the River Environmental overlay zone. The applicant's supplemental narrative must demonstrate that all of the following are met: 1. Land divisions, Property Line Adjustments, and Planned Developments: a. Except for river-dependent and river-related uses and development, proposed uses and development must be outside the combined flood hazard area except as provided under Subparagraph A.1.d. Other areas of the combined flood hazard area must be in environmental resource tracts; b. There are no practicable arrangements for the proposed lots, tracts, roads, or parcels within the same site, that would allow for the provision of significantly more of the building sites, vehicular access, utility service areas, and other development on lands outside the River Environmental overlay zone; c. Development, including building sites, vehicular access and utilities, within the River Environmental overlay zone must have the least amount of detrimental impact on identified resources and functional values as is practicable. Significantly different but practicable development alternatives, including alternative housing types or a reduction in the number of proposed or required units or lots, may be required if the alternative will have less impact on the identified resources and functional values than the proposed development; d. River-dependent and river-related development, rights-of-way, driveways, walkways, outfalls, and utilities; (1) The location, design, and construction method of any outfall or utility proposed within the River Environmental overlay zone has the least significant detrimental impact to the identified resources and functional values of other practicable alternatives including alternatives outside the River Environmental overlay zone; (2) There will be no significant detrimental impact on water bodies for the migration, rearing, feeding, or spawning of fish; and (3) Water bodies are crossed only when there are no practicable alternatives with fewer significant detrimental impacts; and e. Mitigation: (1) The mitigation plan demonstrates that all significant detrimental impacts on

![](https://figures.74-208-44-221.nip.io/portland/20261114/5eddb88fdcb5d9b8adde26efc87a3041f2694efeaf6ba1e8988e314e2ff2fcc8.png)

identified scenic and natural resources and functional values, and the interim loss of functional value will be compensated for. In addition, for proposed development within the riparian buffer area that is not river- dependent or river-related, the mitigation plan must result in a significant improvement of at least one of the following functional values: bank function and control of sediments, nutrients and pollutants, or large wood and channel dynamics; (2) The amount of natural resource mitigation due as compensation is based on the amount and relative condition of the resources and functional values impacted by the proposal. The amount of natural resource mitigation required will be at a ratio of no less than 1.5:1 (mitigation area to project disturbance area) for on-site mitigation or mitigation bank credits and no less than 3:1 for offsite mitigation but may be more to address the following: • The uniqueness of the resources and functional values impacted; • The relative condition of the mitigation area; • The distance between the impact area and mitigation area; and • The time lag between when the resources and functional values are lost due to the impacts and the point when the mitigation site will achieve full functions; (3) To the extent practicable, the natural and scenic resources and functional values restored or enhanced as mitigation must be the same kind of resource, performing the same functions as the lost resource. In addition, the mitigation plan must demonstrate that mitigation for tree removal in the combined flood hazard area must meet or exceed the replacement requirements of Table 475-2 and occur within the combined flood hazard area;

![](https://figures.74-208-44-221.nip.io/portland/20261114/4df822e0ac99830ae0a14bba55b4ba14938dcf5a6fc1fbe4217ac0741bb84308.png)

(4) Mitigation must occur on-site in the River Environmental overlay zone, or an area that is contiguous to the River Environmental overlay zone, when practicable and ecologically beneficial. Factors to be considered when evaluating this criterion include: • The potential for the long-term success of the restored resources and functional values in the mitigation area; • The amount, size, shape, and connectivity potential of on-site mitigation areas; • The location of the mitigation area in relation to existing, proposed or future development on the site, and the impact development may have on the mitigation area; • Contamination; and • Any other site-specific issue or constraint; (5) If on-site mitigation is not practicable or ecologically beneficial, then off-site mitigation is allowed as follows: • Through the purchase of credits from a city approved mitigation bank located along the Lower Willamette River as close as possible to the disturbance area; • Through offsite mitigation in the River Environmental overlay zone. If the offsite mitigation compensates for significant detrimental impacts located within the combined flood hazard area, then the offsite mitigation area must also be located within the combined flood hazard area. The applicant must own the area where the mitigation will occur or possess a legal instrument that is approved by the City as sufficient to carry out and ensure the success of the mitigation plan (such as an easement or deed restriction); (6) In cases where the proposed development is subject to mitigation as the result of obtaining permits from the Oregon Department of State Lands or the U.S. Army Corps of Engineers, the mitigation required for those permits can count toward meeting this mitigation requirement as long as that mitigation is found to adequately compensate for impacts to the identified natural resources and functional values; and (7) The operation and long-term maintenance plan ensures the ongoing maintenance and protection of the mitigation or remediation areas and associated resources and functional values. Plants that die must be replaced in kind. Ongoing monitoring and evaluation of the mitigation or remediation area must occur and monitoring reports must be submitted to Portland Permitting & Development annually for up to 5 years based on scope and size of the mitigation or remediation area. 2. Resource enhancement and mitigation bank projects: a. There will be no net loss of total resource area; b. There will be no net loss of functional values; c. There will be a significant improvement of at least one functional value; and d. For mitigation banks, the applicant must possess a legal instrument, such as a conservation easement or deed restriction, that is approved by the City as sufficient to ensure the right to carry out, monitor and maintain the mitigation. 3. All other proposals in the River Environmental overlay zone: a. Proposed development minimizes the loss of identified natural or scenic resources and functional values consistent with the uses that are generally permitted or allowed in the base zone without a land use review, or permitted or allowed by an approved conditional use review; b. Proposed development locations, designs, and construction methods are less detrimental to identified natural and scenic resources and functional values than other practicable and significantly different alternatives, including alternatives on the same site but outside of the River Environmental overlay zone; c. There will be no significant detrimental impact on areas of the site reserved for mitigation, areas within the River Environmental overlay zone not proposed for development at this time, downstream river habitat, or other sites where environmental restoration is in progress or complete; d. Mitigation: (1) The mitigation plan demonstrates that all significant detrimental impacts on identified scenic and natural resources and functional values, and the interim loss of functional value will be compensated for. In addition, for proposed development within the riparian buffer area that is not river- dependent or river-related, the mitigation plan must result in a significant improvement of at least one of the following riparian functions: bank function and control of sediments, nutrients and pollutants, or large wood and channel dynamics (2) The amount of natural resource mitigation due as compensation is based on the amount and relative condition of the resources and functional values impacted by the proposal. The amount of natural resource mitigation required will be at a ratio of no less than 1.5:1 (mitigation area to project disturbance area) for on-site mitigation or mitigation bank credits and no less than 3:1 for offsite mitigation but may be more to address the following: • The uniqueness of the resources and functional values impacted; • The relative condition of the mitigation area; • The distance between the impact area and mitigation area; and • The time lag between when the resources and functional values are lost due to the impacts and the point when the mitigation site will achieve full functions; (3) To the extent practicable, the natural and scenic resources and functional values restored or enhanced as mitigation must be the same kind of resource, performing the same functions as the lost resource. In addition, the mitigation plan must demonstrate that mitigation for tree removal in the combined flood hazard area must meet or exceed the replacement requirements of Table 475-2 and occur within the combined flood hazard area; (4) Mitigation must occur on-site in the River Environmental overlay zone, or an

![](https://figures.74-208-44-221.nip.io/portland/20261114/eb3c494a976b30180622a0bc1f97ed68dd35753994ffc2601b9c54e54115ddbf.png)

area that is contiguous to the River Environmental overlay zone, when practicable and ecologically beneficial. Factors to be considered when evaluating this criterion include: • The potential for the long-term success of the restored resources and functional values in the mitigation area; • The amount, size, shape, and connectivity potential of on-site mitigation areas; • The location of the mitigation area in relation to existing, proposed or future development on the site, and the impact development may have on the mitigation area; • Contamination; and • Any other site-specific issue or constraint; (5) If on-site mitigation is not practicable or ecologically beneficial, then off-site mitigation is allowed as follows: • Through the purchase of credits from a City approved mitigation bank located along the Lower Willamette River as close as possible to the disturbance area; • Through off-site mitigation in the River Environmental overlay zone. If the offsite mitigation compensates for significant detrimental impacts located within the combined flood hazard area, then the offsite mitigation area must also be located within the combined flood hazard area. The applicant must own the area where the mitigation will occur or possess a legal instrument that is approved by the City as sufficient to carry out and ensure the success of the mitigation plan (such as an easement or deed restriction); and (6) In cases where the proposed development is subject to mitigation as the result of obtaining permits from the Oregon Department of State Lands or the U.S. Army Corps of Engineers, the mitigation required for those permits can count toward meeting this mitigation requirement as long as that mitigation is found to adequately compensate for impacts to the identified natural resources and functional values; and (7) The operation and long-term maintenance plan ensures the ongoing maintenance and protection of the mitigation or remediation areas and associated resources and functional values. Plants that die must be replaced in kind. Ongoing monitoring and evaluation of the mitigation or remediation area must occur and monitoring reports must be submitted to Portland Permitting & Development annually for up to 5 years based on scope and size of the mitigation or remediation area. B. Modification of River Environmental overlay zone boundaries. Modifications of River Environmental overlay zone boundaries that reflect permitted changes in the location or quality of resource areas will be approved upon finding that the applicant's statement demonstrates that either Paragraph B.1 or B.2 are met. For modification of River Environmental zone boundaries based on a more detailed site specific environmental study that confirms the location of natural resource features identified in the adopted Natural Resources Inventory, the applicant's impact evaluation must demonstrate that Paragraph B.3 is met: 1. Successful mitigation. An approved mitigation plan has been successful and a new, restored, or enhanced resource exists which should be included in the River Environmental overlay zone; or 2. Approved loss of resource area. All of the following must be met: a. All approved development in a resource area has been completed; b. All mitigation required of this development has been successful; and c. The identified resources and functional values at the developed site no longer exist, or have been subject to a significant detrimental impact. 3. Modification of River Environmental overlay zone boundaries based on a more detailed site-specific environmental study. The River Environmental overlay zone line location may be modified to more accurately reflect the location of natural resources and functional values on the site. All of the following must be met: a. The modified River Environmental overlay zone boundary must include all natural resource features that receive a high or medium rank using the methodology within the adopted Natural Resources Inventory; b. The modified River Environmental overlay zone boundary must include: (1) Within the Willamette River Central Reach, all land within and riverward of 50 feet from the top of bank of a river, stream, drainageway, wetland or other water body. (2) Within the Willamette River South Reach, all land within and riverward of 100 feet from the top of bank of a river, stream, drainageway, wetland or other water body; and c. The modified River Environmental overlay zone boundary must include the riparian buffer area shown on Map 475-6.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.