For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Research date 2026-11-19. Published 2026-11-20.

Hattiesburg Short-Term Rental Permits and Tax Questions

Identify the covered unit and private restrictions

Hattiesburg’s STR section generally covers a dwelling, condominium or portion offered to paying guests for fewer than thirty consecutive days. It excludes the listed medical or care facilities and distinct accommodation categories, including mobile or manufactured homes, trailers, tents, recreational vehicles and a bed-and-breakfast permitted under City ordinances. A deed-restricted affordable-housing unit cannot be used under this STR program. The excluded categories are not a general statement that those operations may run without their own legal approval. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Hattiesburg Ordinance 3376, Hattiesburg short-term rental registration.

Private restrictions matter in the permit process. The application calls for evidence that the mortgage or deed of trust does not prohibit STR use, insurance that does not exclude it and proof the insurer was notified. A subdivision with an active HOA whose adopted covenants prohibit STRs is not considered for a permit, and the section requires an HOA acknowledgment and support letter to continue the process. Do not rely on ownership, a platform listing or a tax registration as proof that these conditions are satisfied. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Hattiesburg Ordinance 3376, Hattiesburg short-term rental registration.

Check capacity and prepare the application

Each covered unit requires the privilege-tax license, certificate of zoning compliance and occupancy limit, along with the STR permit process. The ordinance caps residential STR permits at 2.5 percent of residential structures, using existing residential water meters tabulated at the start of the fiscal year. When capacity is reached, the section provides a 365-day waiting list requiring a complete application and application fee, with no guarantee of eligibility under other conditions. Confirm current capacity before planning an opening; the code’s cap does not establish that a place is available today. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Hattiesburg Ordinance 3376, Hattiesburg short-term rental registration.

The application information includes the unit’s location, rooms and proposed guests, owner and local manager details, sales-tax collection, proposed rental agreement, parking and trash plans and the required compliance statements. The local manager must live in Forrest or Lamar County and be available around the clock. The owner must notify the City in writing within five days of a change to the manager’s name, address or telephone details. The City’s current page gives submission directions through the Planning Division and Tax Department roles; use the actual current application rather than assume the booking platform submits it. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Hattiesburg short-term rental registration, Hattiesburg Ordinance 3376.

The current City program page lists a $25 application fee, $130 license fee, $50 fire inspection, $25 zoning certificate and $20 privilege-tax license for a new application. It lists $100 license renewal, $50 fire inspection and $20 privilege-tax license for renewal. Section 32-222 expressly gives the most recent Council fee precedence and says other applicable charges can be required. Treat these as the published program items captured November 19, not a guaranteed all-in price for every property or a substitute for the actual assessment. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Hattiesburg short-term rental registration, Hattiesburg Ordinance 3376.

Use the inspected occupancy and operating conditions

The permit specifies the occupancy determined through the building or fire review and can be constrained by the building or parking. The section states two people per sleeping room plus four per dwelling, or plus six for a residential property with more than 3,250 square feet of conditioned living space. It also addresses how those rules interact with other occupancy regulations. Do not increase capacity merely by adding rooms or another structure: inspection approval and an amended registration are required for the increase. The formula is not permission to exceed the actual permit. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Hattiesburg Ordinance 3376.

Inspection items include smoke detectors, applicable carbon-monoxide detectors, appropriately placed extinguishers, window and door conditions and utility safety. Parking limits are set following site review, with off-street availability and street conditions considered; in the stated circumstances an off-street space may need to be constructed or secured. Approval does not legalize an unpermitted use or structure. Do not promise guests an extra sleeping room, parking space or separate building based only on its physical availability. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Hattiesburg Ordinance 3376.

The manager and owner must address cleanliness, covered garbage containers, noise awareness and the required posted rules. Rules covering occupancy, parking, noise and garbage, along with a copy of the ordinance, must be displayed as the section requires. The local contact details are provided to the designated City offices and posted inside the unit; the contact must respond around the clock. The primary-guest registry must be kept and is subject to the section’s ten-day written inspection notice. These are continuing duties after a permit is issued. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Hattiesburg Ordinance 3376.

Keep renewal and ownership changes separate

The STR permit expires one year after issuance. Renewal includes review of complaints and compliance, and a denied renewal has its own correction and appeal sequence in the section. A sale or other property transfer automatically expires the STR permit; a new owner must apply anew. The separate privilege-tax license uses its own issue-month dating rule. Do not market the STR permit as transferable with the property or assume that renewing one credential renews them all. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Hattiesburg Code of Ordinances § 48-20 Corpus copy, Hattiesburg Ordinance 3376, Hattiesburg short-term rental registration.

For revocation, the section provides written reasons and a ten-day correction period, followed by the specified order and written appeal process. It says revocation remains effective while that appeal is pending. The denied-renewal sequence and the revocation-order sequence are different, so preserve the actual notice and follow the controlling procedure rather than borrow a universal ten-day deadline. Operating without the required permit can create separate daily violations under the section. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Hattiesburg Ordinance 3376.

Separate state, local and platform tax questions

City operating approval does not replace state sales-tax obligations. The retained state sales-tax provision and current DOR rates page address hotels and other taxable activities. The older Corpus copy of section 41-49-3 contains only the earlier basic hotel definition and does not include the newer tax-only facilitator subsection. The complete official 2025 SB2805 text, whose action history confirms Chapter 430 and July 1, 2025 effectiveness, adds that subsection and changes section 27-65-23.1. Use the enacted text and current agency materials together instead of silently treating the older copy as a complete current definition. Miss. Code Ann. § 27-65-23 Corpus copy, Miss. Code Ann. § 41-49-3 Corpus copy, Mississippi 2025 SB2805, final SG text, Mississippi 2025 SB2805, final SG text, Mississippi 2025 SB2805 action history, Mississippi Revenue sales-tax rates.

DOR Notice 72-25-06 explains collection by qualifying third-party booking companies, including facilitation charges, and relief for owners when a registered company collects the applicable taxes. The enacted amendment also preserves a resolution condition for certain local-private hotel levies, while DOR’s Hattiesburg table prints local rates with unit-count exclusions and newer session-law references. Those materials require reconciliation with actual local resolutions and levy texts. Do not quote a universal combined STR percentage, assume a small-unit exclusion settles every platform transaction or assume every booking platform has discharged every tax duty. Miss. Code Ann. § 27-65-23 Corpus copy, Miss. Code Ann. § 41-49-3 Corpus copy, Mississippi 2025 SB2805, final SG text, Mississippi 2025 SB2805, final SG text, Mississippi Revenue Notice 72-25-06, Mississippi Revenue tourism and economic development taxes.

Keep the source trail with the property

Code links are Corpus-hosted copies from the official Hattiesburg publisher, retained through Ordinance 3388, September 16, 2025 and collected November 1, 2026. The City’s signed March 18, 2025 STR ordinance and current registration page were independently captured November 19. State copies retain their republisher provenance, while the official enacted hotel text, history and DOR materials are separately identified. The license guide and local research guide help resolve the actual credential, source date or material tax comparison before relying on a general summary. Hattiesburg Code of Ordinances § 32-222 Corpus copy, Miss. Code Ann. § 41-49-3 Corpus copy, Hattiesburg short-term rental registration, Hattiesburg Ordinance 3376, Mississippi 2025 SB2805 action history.

Corpus business services

Want us to handle the DBA filing?

DBA filing for an existing LLC: $199 service fee plus itemized filing costs. We confirm your state, county and filing scope before you pay.

Corpus business services

Want a report for your business?

Get a human-reviewed licence-and-permit report for one activity and location, with citations, official application links and coverage gaps. $99 once; scope review before payment. Research only: permit applications and parcel-level zoning clearance are not included.