§ 78-811 — Permit required
Code of Ordinances of the City of Fairbanks, Alaska (Codified through Ordinance No. 6332, effective December 21, 2025. (Supp. No. 36)) · Fairbanks Code of Ordinances § 78-811
Corpus is an independent public-information project, not the official City of Fairbanks website. Stable reference: corpuslaw.us/code/2b3d5d78-b00b-4c41-bbd6-7308ea38dc57
Sec. 78-811. - Permit required.
Depending upon the merits of each individual case, special permits may be issued by the city engineer for the movement of loads such as buildings of such an excessive size as to require a temporary disruption or blocking of traffic. Such permits shall be subject to the following special requirements in addition to the general regulations applicable to all oversize load movements: (1) Loads of excessive overlength size shall be issued permits for movements within the city only. (2) When crossing a state highway or city through street, traffic shall not be interrupted for more than 30 minutes. Such interruption of traffic may be allowed only when adequate detour routes are unavailable. When detour of traffic is possible, flagmen shall be provided by the permittee to direct traffic along the detour around the oversize load and back to the state highway or through street. (3) Issuance of permits to move loads of excessive size shall be reviewed by the city engineer to determine the number and location of traffic signals, flashing beacons and sign structures involved along the route. A minimum of two weeks' notice and coordination with the engineering department shall be required if it is necessary for city electricians to lower and replace traffic control devices to provide for passage of an oversize load. As an alternative, the house mover may furnish qualified licensed electricians to remove and replace traffic control devices. In case other than city personnel perform the removal and replacement of traffic control devices, the movement shall not be made unless a city inspector is present to observe the passage of the oversize load and inspect the facilities to ensure that traffic signal heads are in proper alignment and functioning properly after the passage of the load. When city electricians or inspectors are required in connection with the movement of an overlegal load the city engineer shall make an estimate of the cost of labor and equipment rental to be incurred by the city. A cash bond in an amount equal to the estimated costs to the city shall be required before the permit is issued. The bond will be held until the oversize load has been moved and the traffic control installation has been restored to proper working order. Any part of the bond in excess of labor and equipment rental will be returned to the permittee after a report of the actual costs to the city have been received. (4) Permits for loads over 16 feet high will not be issued until the applicant furnishes certification that arrangements have been made with public utility companies for their participation, if required, in clearing the route for the overheight load, and that arrangements have been made to bypass any immovable overhead structure en route. (5) Time of travel of excessively oversize loads shall be restricted to the time of day or day of week when traffic interference will be at a minimum. The movement may be required to be made between midnight and daybreak to avoid traffic congestion.
(Code 1960, § 7.17.130)
Ask a question about Fairbanks law
Corpus searches the Fairbanks sections it holds and shows the ones that match, with their citations. Free, no sign-in.
