12.12.040 - Work standards.
Work shall conform to the following requirements: A. Prior Approval of Materials. Prior to beginning the excavation, all the equipment, pipefittings. etc., required to complete the installation, shall be on hand, checked for fit, and approved by an authorized inspector. B. Safety. The contractor shall be responsible for safety of the general public as well as persons working in excavation. Adequate shoring, barricades, flares, signs, pedestrian bridges, and other protective devices shall be provided by the contractor. The contractor shall provide any additional protective devices or take additional precautions required by the director of public works or his authorized representative. C. Repair of Damage. Any damage to utilities, streets, or other public or private property caused ' by this operation shall be repaired to the satisfaction of the director of public works or his authorized representative. D. Backfill Material. All backfill shall consist of the same material removed from the trench with the following exceptions: trash, organic debris and frozen materials shall not be replaced in the trench. Such material, if present, shall be replaced with clean, pit-run gravel. When the street is surfaced with either pit-run or crushed gravel or if both are present, clean material, corresponding in graduation and fracture count shall be replaced to a compacted depth equal to the depth of such material in the remainder of the street, but in no case less than four inches. E. Backfill Compaction. All backfill shall be compacted in small lifts to a minimum of ninety-five percent of maximum density as determined by AASHO Standard Method T-180, Method D. F. Failure to Restore. Every effort shall be made to complete all work and restore the street to its original condition in the shortest possible time. Except in the case of unusual and extenuating circumstances as determined by the director of public works or his authorized representative, a penalty shall be charged the contractor whenever the time that an excavation remains open or the street has not been restored to its original condition exceeds three days at the rate of ten dollars per day. However, if said contractor fails, refuses, or neglects to restore the street to its original condition within ten days, the city manager is authorized and directed to have such street restored to its original condition by city work forces and/or other contractual arrangements with appropriate charge back to the original permit holder for the entire cost of such work. If the contractor feels that charges levied by the director of public works or his authorized representative is unreasonable, he may appeal to the city council by a letter directed to the city manager within five days after the charges have been levied in writing to the contractor involved. G. All excess dirt and debris and construction materials shall be removed from thejobsite after completion and before acceptance. Excess dirt shall not be spread over adjacent streets or alleys.
(Prior code § 12.05.090(d)).
Ask a question about Kotzebue law
Corpus searches the Kotzebue sections it holds and shows the ones that match, with their citations. Free, no sign-in.