14.15.215 - Metering electricity use.

A. The registration of the city's meter shall be accepted and received at all times and places as prima facie evidence of the amount of power and energy used by the customer. Quantity of energy use will be determined under the following provisions. 1. Energy use (KWH). Meters designed to quantitatively determine energy use measured in kilowatt hours will be installed, calibrated and monitored by the city on all services except where: a. Energy use is fixed by type of service and fixed billings will accurately recover all costs; b. Service is temporary and metering would be impractical. Energy usage would then be estimated and billed accordingly. The city reserves the final right to determine these exemptions; however, any customer under the above conditions who desires a meter will be provided one at the customer's expense. 2. Energy demand (KW). For certain rate schedules provisions for measuring and billing monthly noncoincident demands are required. Meters designed to indicate or record the highest 15 minute demand in the billing period will be installed, calibrated, monitored and read by the city on all affected customer services according to rate schedule requirements. B. When the service exceeds 200 amperes or 480 volts, the city will provide at customer expense current transformers and/or potential transformers (PT's or CT's) at a ratio designated by the city for metering. The customer shall install the PT's or CT's in a sealable enclosure and shall furnish and install all necessary meter sockets and raceways. The city will install the wiring from the instrument transformers to the meter sockets in raceways provided by the customer. In the case of customer's primary metering, which is generally installed on wood poles, the city shall install such equipment at customer's expense.

(Ord. 504, 1982; Ord. 95-06)