For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.15.315 — Point of delivery

City Code of the City of Seward, Alaska (Codified through Ordinance No. 2026-006, enacted July 27, 2026. (Supp. No. 33-1, Update 1)) · Seward City Code § 14.15.315

Corpus is an independent public-information project, not the official City of Seward website. Stable reference: corpuslaw.us/code/7b1c5f72-2eeb-49cc-b75e-5d4c1778f488

14.15.315 - Point of delivery.

A. Point of delivery for overhead services must be arranged so that the city's conductors can be attached in one place and one place only for drop into the customer's service entrance. The customer will be required to provide equipment for attaching the city's conductors to building surfaces with adequate strength to support the city's conductors. Point of delivery for services will be on a mutually acceptable location pre-arranged with the city's engineering department. B. The city will not be obligated to provide service to a structure at a point not designated by the city, and a customer who proceeds without the designation of location may be required to modify the wiring or other construction to provide for service equipment at a location subsequently designated by the city. C. It is the responsibility of the customer or electrical contractor to notify the city's engineering department of all special service requirements in advance of installing new equipment or modifying old equipment at the service entrance and to determine a suitable service entrance location acceptable to both the customer and the city.

(Ord. 504, 1982)

Ask a question about Seward law

Corpus searches the Seward sections it holds and shows the ones that match, with their citations. Free, no sign-in.