14.15.410 - Alternative power source.

A. The city will permit the interconnection and operation of small (less than 25KW) alternative power source facilities with its integrated electrical distribution system upon compliance by the customer with the following provisions. 1. A customer who owns any alternate technology generation shall request approval from the city to interconnect with its system at least three months prior to the date on which the customer intends to make any connection in any way to the electric circuitry common to the city's integrated distribution system. 2. The customer shall submit to the city, along with an application for interconnection, complete documentation of alternate technology generation equipment including but not limited to: schematics; wiring diagrams; performance specifications; descriptions of energy storage devices, circuit protection equipment, regulation equipment, automatic disconnect equipment, and any other proprietary device provided by the equipment manufacturers. 3. Upon approval of the interconnection by the city, the customer shall agree under special contract with the city to pay the cost of any special metering equipment or circuit modifications determined by the city as necessary to accomplish the interconnection; to install power factor corrective equipment as necessary to maintain a power factor of not less than 0.9; to operate the generation equipment in strict compliance with safety procedures established by the city, and to accept the terms of purchase of energy or capacity or both as set forth in the contract. B. The city reserves the right to refuse interconnection with alternative power sources or to limit the number of interconnections on any single substation circuit if it is determined by the city that any such interconnection would be harmful or hazardous to its system, its employees or other customers. If a proposed interconnection is refused by the city, the city will provide the customer within three months of the initial request written notice of refusal, including a statement of the reason(s) for the refusal. C. If an unauthorized interconnect is found, the city will immediately terminate service to those facilities and reconnect the service only when all conditions of these provisions are satisfied.

(Ord. 504, 1982; Ord. 504, 1982; Ord. No. 2014-003, § 1, 6-9-2014)