§ 7.25.025 — Contract provisions
City Code of the City of Seward, Alaska (Codified through Ordinance No. 2026-006, enacted July 27, 2026. (Supp. No. 33-1, Update 1)) · Seward City Code § 7.25.025
Corpus is an independent public-information project, not the official City of Seward website. Stable reference: corpuslaw.us/code/67433904-4f83-4ca1-874b-fe6e3a244451
7.25.025 - Contract provisions.
A materials contract must include, but is not limited to A. A description of the sale area, the maximum volume, board feet or weight of material to be removed from the sale area, the method of payment by the operator; B. The operator's site-specific operating requirements including, but are not limited to, compliance with all applicable local, state and federal laws and regulations, requirements relating to boundary markers and survey monument protection; erosion control and protection of water; fire prevention and control; roads; sale area supervision; protection of fish, wildlife and recreational values; sale area access; safety; limitations on blast size and location and/or extraction methods with respect to the impact on adjacent and nearby properties, utilities and infrastructure; and reclamation; C. A requirement that a performance bond be in place at all times for the duration of the contract covering, at a minimum, estimated rehabilitation costs and management agreement completion costs if performed by other than the operator; and D. A requirement that the operator maintain insurance as determined by the city's risk manager, assumption of all risk and liability under the contract, and indemnification of the city including adding the city as an additional insured with a waiver of subrogation on all insurance policies.
(Ord. 2003-07)
Ask a question about Seward law
Corpus searches the Seward sections it holds and shows the ones that match, with their citations. Free, no sign-in.