Sec. 19-129. - State indirect discharge permits.
(a) Required. All significant industrial users proposing to connect to or to contribute to the POTW shall obtain a state indirect discharge permit before connecting to or contributing to the POTW. (b) Application. Significant industrial users required to obtain an SID permit shall complete and file with the city an application in the form prescribed by the state. Proposed new users shall apply at least ninety (90) days prior to connecting to or contributing to the POTW. In support of the application, the applicant shall submit, in units and terms appropriate for evaluation, an engineering report, prepared by a professional engineer registered in the state, containing the following information, except in cases of existing significant industrial users where the city engineer does not deem it appropriate: (1) Name, address, and location, (if different from the address). (2) SIC number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended. (3) The existing or anticipated waste water constituents and characteristics including but not limited to those mentioned in section 19-108. For existing users, the waste water, constituents and characteristics shall be determined by a reliable analytical laboratory sampling and analysis being performed in accordance with procedures established by the EPA pursuant to Section 304(g) of the Act and contained in 40 CFR 136, as amended. (4) Time and duration of contribution. (5) Average daily and maximum daily waste water flow rates, monthly and seasonal variations if any. (6) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, and appurtenances by the size, location and elevation. (7) Description of the activities, facilities, and plant processes on the premises including all materials which are or could be discharged. (8) Where known, the nature and concentration of any pollutants in the discharge which are limited by any city, state or federal pretreatment standards, and, for existing users, a statement regarding whether or not the pretreatment standards are being met on a consistent basis and if not, whether additional operation and maintenance (O and M) and/or additional pretreatment is required for the user to meet applicable pretreatment standards. (9) If additional pretreatment and/or O and M will be required to meet the pretreatment standards, the user shall specify the shortest schedule by which the user will provide such additional pretreatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to this schedule: a. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary engineering report, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). b. No increment referred to in subparagraph (c)(9)a. shall exceed nine (9) months. c. No later than fourteen (14) days following each date in the schedule and final date for compliance the user shall submit a progress report to the city engineer, including, as a minimum, whether or not it complied with the increment of progress to be met on such date, and if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine (9) months elapse between such progress reports to the city engineer. (10) Each product produced by type, amount, process or processes and rate of production. (11) Type and amount of raw materials processed, average and maximum per day. (12) Number and type of employees, and hours of operation of plant and proposed or actual hours of operation of pretreatment system. (13) Any other information as may be deemed by the city to be necessary to evaluate the permit application. The city engineer will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished, the city engineer may approve the connection subject to terms and conditions provided herein. (c) Modifications. After the promulgation of a national categorical pretreatment standard, users subject to such standards shall be required to comply with such standards within the time frame prescribed by such standard. Where a user, subject to a national categorical pretreatment standard, has not previously submitted an application for an SID permit as required by subsection (b), above, the user shall apply for an SID permit within one hundred eighty (180) days after the promulgation of the applicable national categorical pretreatment standard. In addition, the user with an existing SID permit shall submit to the city engineer within one hundred eighty (180) days after the promulgation of an applicable federal categorical pretreatment standard the information required by paragraphs (8) and (9) of subsection (b). (d) Conditions. State indirect discharge permit holders shall be expressly subject to all provisions of this article and all other applicable regulations, user charges, and fees established by the city. (e) Duration. SID permits shall be issued for a specified time period, established by the ADEM. (f) Transfer. SID permits are issued to a specific user for a specific operation. Permits shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation without the approval of the city and state. Any succeeding owner or user shall also comply with the terms and conditions of the existing permit.
(Ord. No. 1108, Art. VII, § 4(B), 12-7-82)
Ask a question about Auburn law
Corpus searches the Auburn sections it holds and shows the ones that match, with their citations. Free, no sign-in.