Sec. 19-88. - Owner or applicant to bear costs.

(a) Sewer taps. The property owner or developer is responsible for all costs associated with the installation of the new sewer service and for hiring a contractor, who must be a licensed and bonded general contractor carrying the designation of MU-(S)-Sewer projects on their state general contractors license, to complete the work. The work will generally include the installation of a new sewer tap and service pipe or sewer lateral line between the sanitary sewer main and right-of-way or edge of easement for the premises to be served, and any other appurtenances that may be required. All work shall be performed in accordance with the Public Works Design and Construction Manual and the Water Resource Management Design and Construction Manual. It shall be the responsibility of the owner or developer to ensure that all site conditions are restored as appropriate, such as but not limited to; asphalt, curb, gutter, sidewalks and similar infrastructure. (b) No sewage service will be furnished through any new connection until the new sewer tap has been inspected and approved. (c) All access fees required per section 19-153(b) shall be paid prior to approval to proceed with the installation of a new sewer tap.

(Ord. No. 1108, Art. V, § 2, 12-7-82; Ord. No. 1455, § 1, 10-6-92; Ord. No. 2989, § 1, 8-16-16)