For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-7 — Schedule of permit and reinspection fees

Code of Ordinances of the City of Auburn, Alabama (Codified through Ordinance No. 3567, enacted January 20, 2026. (Supp. No. 91)) · Auburn Code of Ordinances § 5-7

Corpus is an independent public-information project, not the official City of Auburn website. Stable reference: corpuslaw.us/code/db2a3dad-948a-4e9e-8760-42f5cc9073d1

Sec. 5-7. - Schedule of permit and reinspection fees.

The following permit fees shall be charged: Commercial Building Permit Fees: Total Valuation | Fee Schedule Less than $100.00 | No fee unless inspection required, in which case a $7.00 fee for each inspection shall be charged. $100.00 up to and including $50,000.00 | $7.00 per thousand or fraction thereof. Over $50,000.00 up to and including $100,000.00 | $350.00 for the first $50,000 plus $5.00 for each thousand or fraction thereof. Over $100,000.00 up to and including $1,000,000.00 | $600.00 for the first $100,000.00 plus $4.00 for each additional thousand or fraction thereof. Over $1,000,000.00 | $4,200.00 for the first $1,000,000.00 plus $3.00 for each additional thousand or fraction thereof. Residential Building Permit Fees: Total Valuation | Fee Schedule Less than $100.00 | No fee unless inspection required, in which case $7.00 fee for each inspection shall be charged. $100.00 up to and including $50,000.00 | $7.00 per thousand and fraction thereof. Over $50,000 up to and including $100,000.00 | $350.00 for the first $50,000.00 plus $5.00 for each additional thousand or fraction thereof. Over $100,000.00 up to and including $1,000,000.00 | $600.00 for the first $100,000.00 plus $4.00 for each additional thousand or fraction thereof. Over $1,000,000.00 | $4,200.00 for the first $1,000,000.00 plus $3.00 for each additional thousand or fraction thereof. Electrical Permit Fees: Permit Issuance Fee | $10.00 In addition to Permit Issuance Fee: 1 to 9 outlets | 5.00 10 to 14 outlets | 8.00 15 to 24 outlets | 11.00 25 to 49 outlets | 14.00 50 to 74 outlets | 17.00 75 to 100 outlets | 20.00 Over 100 outlets, per outlet | .25 Services | 10.00 Ranges | 4.00 Water Heaters | 4.00 Dryers | 4.00 Other major appliances | 4.00 Motors not part of heating and air conditioning: Up to 1 horsepower | 4.00 1 horsepower to 2 horsepower | 5.00 2 horsepower to 4 horsepower | 6.00 4 horsepower to 10 horsepower | 8.00 10 horsepower and over | 10.00 Inspection fees for repairing wiring or rewiring existing buildings and for replacing wiring destroyed by fire or other disaster shall be the same as for new work. Mechanical Permit Fees: Permit Issuance Fee | $10.00 In addition to Permit Issuance Fee: One ton and up to 5 tons or fraction thereof, per ton | 4.00 Over five tons and up to 10 tons or fraction thereof, per ton | 3.00 Over 10 tons, per ton | 2.00 Fee for systems with heat only: Electric Systems, per kw | 1.00 Gas Systems, per 10,000 BTU | 2.00 Plumbing Permit Fees: Permit Issuance Fee | $10.00 In addition to Permit Issuance Fee: Each plumbing fixture, drain or trap, including water and drainage piping | 2.50 For each house sewer | 5.00 For each house sewer having to be replaced or repaired | 5.00 For each cesspool | 5.00 For each septic tank and seepage pit or drain field | 10.00 For each water heater and/or vent | 2.50 Fuel Gas Permit Fees: Permit Issuance Fee | $10.00 For each gas piping system, per outlet | 4.00 Moving of building or structures: For the moving of any building or structure, the fee shall be one hundred fifty dollars ($150.00). Demolition of building or structures: For the demolition of any building or structure, the fee shall be one hundred dollars ($100.00). Failure to obtain permit: Where work for which a permit is required by this Code is started or proceeded with prior to obtaining said permit, the fees herein shall be doubled, but the payment of such double fee shall not relieve any persons from fully complying with the requirements of this Code in the execution of the work nor from any other penalties prescribed herein. Re-inspection fees: A contractor will be allowed one inspection and one re-inspection of the same phase of work under the permit issued. The third (3 rd ) inspection shall be thirty-five dollars ($35.00). All additional inspections shall be one hundred twenty dollars ($120.00). If an inspection is requested and the building is locked then a re-inspection fee will be charged for the trip.

(Ord. No. 3325, § 3, 9-7-21)

Ask a question about Auburn law

Corpus searches the Auburn sections it holds and shows the ones that match, with their citations. Free, no sign-in.