§ 7-37 — Duties and responsibilities of the floodplain administrator
Code of Ordinances of the City of Auburn, Alabama (Codified through Ordinance No. 3567, enacted January 20, 2026. (Supp. No. 91)) · Auburn Code of Ordinances § 7-37
Corpus is an independent public-information project, not the official City of Auburn website. Stable reference: corpuslaw.us/code/6130953a-7768-4ed1-9b78-6c6b45fd7132
Sec. 7-37. - Duties and responsibilities of the floodplain administrator.
The floodplain administrator and his/her designated staff is hereby authorized and directed to enforce the provisions of this article. The floodplain administrator is further authorized to render interpretations of this article, which are consistent with its spirit and purpose. Duties of the floodplain administrator shall include, but shall not be limited to: (1) Require permits for all proposed construction or other development in the community, including the placement of manufactured homes, so that it may be determined whether such construction or other development is proposed within flood-prone areas. Ensure the public is aware that floodplain development permits are required for development in SFHAs. (2) Conduct regular inspections of the community's SFHAs for any unpermitted development and issue stop work orders and notice of violations for any such development. Any unpermitted structure or nonstructural development in the SFHA will be considered a violation until such time that the violation has been remedied. (3) Review proposed development to assure that all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Maintain such permits permanently with floodplain development permit file. (4) Review all permit applications of proposed development, to determine whether the proposed construction or other development will be reasonably safe from flooding and to assure compliance with this article. a. If the provisions of this article have been met, approve the permit. b. If the provisions of this article have not been met, request that either corrections and accurate completion of the application be made or disapprove the permit. (5) When BFE data or floodway data have not been provided in accordance with division 2, section 7-21 then the floodplain administrator shall obtain, review and reasonably utilize any BFE and floodway data available from a federal, state, or other sources in order to administer the provisions of division 4. (6) Verify and record the actual elevation of the lowest floor, in relation to mean sea level (or highest adjacent grade), including basement, of all new construction or substantially improved residential structures in accordance with division 3, subsection 7-36(2). a. Review elevation certificates and require incomplete or incorrect certificates to be corrected and resubmitted for approval. b. A post-construction elevation certificate is required to be kept with the permit and certificate of occupancy in perpetuity; a pre-construction elevation certificate can be used to ensure the correct elevation for the lowest floor and machinery along with the correct number of vents that will be used. (7) Verify and record the actual elevation, in relation to mean sea level to which any new or substantially improved nonresidential structures have been elevated or floodproofed, in accordance with division 3, section 7-36, or division 4, subsections 7-42(2) and 7-45(2). (8) When floodproofing is utilized for a nonresidential structure, the floodplain administrator shall obtain certification of design criteria from a professional engineer, licensed to practice in the State of Alabama, or licensed architect, registered to practice in the State of Alabama, in accordance with division 3, subsection 7-36(1) and division 4, subsections 7-42(2) or 7-45(2). (9) Notify adjacent communities and the Alabama Department of Environmental Management and the appropriate district office of the U.S. Army Corps of Engineers prior to any alteration or relocation of a watercourse. Submit evidence of such notification to FEMA and the NFIP State Coordinator's Office (Alabama Department of Economic and Community Affairs, Office of Water Resources). (10) For any altered or relocated watercourse, submit engineering data/analysis within six (6) months after completion of the project to FEMA and state to ensure accuracy of community flood maps through the letter of map revision process. Assure flood carrying capacity of any altered or relocated watercourse is maintained following completion of the project. (11) Where interpretation is needed as to the exact location of boundaries of the SFHA (for example, where there appears to be a conflict between a mapped boundary and actual field conditions), the floodplain administrator shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article. (12) All records pertaining to the provisions of this article shall be maintained, in perpetuity, at the office of the floodplain administrator and shall be available for public inspection when requested. (13) For any improvements made to existing construction located in the SFHA (as established in division 2, section 7-21) ensure that a permit is obtained. Also, conduct substantial improvement (SI) (as defined in division 6 of this article) reviews and analysis of all structural development permit applications. Maintain a record of the SI calculations and comments within the permit files in accordance with subsection 7-37(11) of this division. (14) For any residential and nonresidential structures located in the SFHAs that are damaged from any source, natural hazard or man-made, conduct substantial damage (SD) (as defined in division 6 of this article) assessments. a. The floodplain administrator shall ensure that permits are obtained, in accordance with this article, prior to any repairs commencing. b. Make SD determinations whenever structures within the SFHA area are damaged by any cause or origin. SD determinations shall not be waived to expedite the rebuilding process during a post-disaster recovery or for any other reason. c. If the community has a large number of buildings in their SFHA that have been damaged, they should decide in advance how best to handle permitting and inspecting damaged buildings for substantial damage determinations. d. If required, a moratorium may be placed on all nondisaster related construction permits until the community has sufficiently completed its SD determinations. e. The SD determinations should be performed immediately after the damage-causing event or other cause of damage. f. The community shall utilize methods and tools for collecting building data and performing analyses that will provide reasonable and defensible SD determinations. Those tools shall be capable of generating reports for record-keeping purposes and to provide to the applicable property owners if requested. g. Maintain a record of the SD calculations within permit files in accordance with subsection 7-37(11) of this article. h. If the SD determination finds that the extent that the cost of restoring the structure to its before-damaged condition would equal or exceed fifty (50) per cent of the market value of the structure before the damage occurred, the floodplain administrator shall: 1. Coordinate with the property owner and issue a letter to convey the SD determination. 2. Determine if the damage was caused by flooding and include the cause in the letter to the property owner. Also, include whether or not the structure qualifies as a repetitive loss structure per the definitions in division 6 of this article. The information can be used to determine if the claim is eligible for an increased cost of compliance claim. 3. Coordinate with property owners and insurance companies for any NFIP claims. 4. If the repairs are to proceed, coordinate with the permit applicant to ensure a permit is obtained and inspections are conducted to ensure that all applicable provisions of this article are adhered to without exception or waiver. i. A structure qualifies as a repetitively damaged structure (synonymous to repetitive loss property) if it's determined to have been damaged by flooding two (2) or more times within a 10-year period where the cost of repairing the flood damage, on average, equaled or exceeded twenty-five (25) per cent of its market value at the time of each flood event. All of the provisions of division 3, subsection 7-37(13) for substantial damages shall apply to any repetitively damaged structure, whether it is covered by NFIP flood insurance or not. j. Ensure that phased improvements and incremental repairs do not circumvent the SI/SD requirements. k. Ensure that any combinations of elective improvements being made in addition to the necessary repairs to damages are included in making the SI/SD determination. l. An applicant for a permit may appeal a decision, order, or determination that was made by the local official for the following: 1. The local official's finding or determination that the proposed work constituting a SI/SD were based on insufficient information, errors, or repair/improvement costs that should be included and/or excluded; 2. The local official's finding or determination that the proposed work constituting a SI/SD were based on inappropriate valuations of costs for the proposed work, or an inappropriate method to determine the market value of the building. m. It is not appropriate for a permit applicant to seek an appeal who wishes to build in a manner that is contrary to the regulations and codes included in this article. In those cases, the applicant should seek a variance. n. Ensure that any building located in a floodway that constitutes a SI/SD has an engineering analysis performed in accordance with division 4, subsection 7-43(2). If that analysis indicates any increase in the BFE, the local official must not allow the proposed work unless the structure is brought into full compliance with this article. (15) Coordinate with insurance adjusters prior to permitting any proposed work to bring any flood-damaged structure covered by a standard flood insurance policy into compliance (either substantially damaged structures or repetitive loss structures) to ensure eligibility for ICC funds.
(Ord. No. 3523, § 1, 12-3-24)
Ask a question about Auburn law
Corpus searches the Auburn sections it holds and shows the ones that match, with their citations. Free, no sign-in.
