§ 10 — Floodplain zone districts
Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances, App. D, tit. 2, art. VI, § 10
Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/c50f7a92-f44e-4912-9a46-074117ea58d1
Section 10. - Floodplain zone districts.
All of the zone districts heretofore established shall be modified and supplemented in the following instances and according to the following rationale: 1. Rationale; purpose. Certain lands and flood hazard areas of the City of Birmingham are subject to periodic inundation which results in loss of life, property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare. These flood losses are caused by the cumulative effect of obstructions in the floodplains causing increases in flood heights and velocities, and by the occupancy in flood hazard areas by uses vulnerable to floods or hazards to other lands which are inadequately elevated, floodproofed, or otherwise protected from flood damages. It is the purpose of this section to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by the following provisions designed to: a. Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which result in damaging increases in erosion or in flood heights or velocities; b. Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction; c. Control the alteration of natural floodplains, stream channels, and natural protective barriers which are involved in the accommodation of floodwaters; d. Control filling, grading, dredging and other development which may increase erosion or flood damage; and e. Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands. The basic underlying objectives that guided the preparation of this section are: the protection of human life and health; the minimizing of public expenditures for costly flood control projects, and rescue and relief efforts associated with flooding, as well as interruption and damage to individual residents, businesses, industry and public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges; and in general the development and maintenance of a stable tax base by providing for the sound use and development of floodprone areas in such a manner to minimize future flood blight and insure that all purchasers of private property subject to flooding are notified that such property is in a flood area. 2. Definitions. Any other provision in this section to the contrary notwithstanding for the purposes of this subsection 2, the following words, terms and phrases shall have the meanings ascribed to them in this subsection 2. Unless specifically defined herein, words or phrases used in this section shall be interpreted so as to give them the meaning they have in common usage and give this section its most reasonable application. When not inconsistent with the context, words used in the present tense shall include the future tense, words in the plural number shall include the singular number, and words in the singular number shall include the plural number. a. Addition (to an existing building) means any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a fire wall. Any walled and roofed addition which is connected by a fire wall or is separated by independent perimeter load-bearing walls is new construction. b. Administrative officer means the person(s) appointed to administer, interpret and implement the provisions of this section in accordance with the provisions of subsection 4.a and b. c. Appeal means a request for a review of the administrative officers' interpretation of any provision of this section or a request for a variance. d. Area of shallow flooding means a designated AO Zone on a community's flood insurance rate map (FIRM) with a one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow. e. Area of special flood hazard means the land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year. f. Base flood means the flood having a one percent chance of being equaled or exceeded in any given year. g. Basement means any area of a building having its floor subgrade (below ground level) on all sides. h. Breakaway wall means a wall that is not part of the structural support of the building and is intended through its design and construction to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or the supporting foundation system. i. Building. See Structure. j. Development means any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavating or drilling operations, or storage of materials or equipment. k. Elevated building means a nonbasement building (1) built to have the top of the elevated floor elevated above the ground level by means of pilings, columns (posts and piers), or shear walls parallel to the flow of the water and (2) adequately anchored so as not to impair the structural integrity of the building during a flood of up to the magnitude of the base flood. [The term] "elevated building" also includes a building elevated by means of fill or solid foundation perimeter walls with openings sufficient to facilitate the unimpeded movement of floodwaters. l. Existing construction means structures for which the "start of construction" commenced before May 5, 1981, the effective date of the initial floodplain management ordinance adopted by the city. [The term] "existing construction" may also be referred to as "existing structures." m Existing manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before May 5, 1981, the effective date of the initial floodplain management ordinance adopted by the city. n. Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads). o. Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from the overflow of inland or tidal waters or the unusual and rapid accumulation of runoff of surface waters from any source. p. Flood insurance rate map (FIRM) means an official map of a community, on which the Federal Emergency Management Agency has delineated both the areas of special flood hazard and the risk premium zones applicable to the community. q. Flood insurance study means the official report provided by Federal Emergency Management Agency. The report contains profiles along distances of each studied stream with stream bed elevations and corresponding flood elevations, as well as flood maps and the water surface elevation of the base flood. r. Floodplain means the area of special flood hazard covered by a flood having a one percent chance of being equaled or exceeded in any given year and delineated as a Zone A, AO, A1-30, AE, A99 or AH on the community's flood insurance rate map (FIRM). s. Floodproofing means any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. t. Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. u. Functionally dependent facility means a facility which cannot be used for its intended purpose unless it is located or carried out in close proximity to water, such as a docking or port facility necessary for the loading and unloading of cargo or passengers, shipbuilding, ship repair, or seafood processing facilities. The term does not include long-term storage, manufacture, sales or service facilities. v. Highest adjacent grade means the highest natural elevation of the ground surface, prior to construction, next to the proposed walls of a structure. w. Historic structure means any structure that meets one or more of the following criteria: (1) Listed individually in the National Register of Historic Places (a listing maintained by the Department of the Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; (3) Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or (4) Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either: (i) By an approved state program as determined by the Secretary of the Interior; or (ii) Directly by the Secretary of the Interior in states without approved programs. x. Improvement cost, for determining "substantial improvement," means the value of all costs for improvements and/or repairs to a structure. Cost shall include all structural costs for labor and materials, as well as all finish materials, built-in appliances, hardware, profit and overhead but excluding plans, surveys, permit fees, debris removal and clean-up, items not considered real property, and accessory structures. The improvement cost shall be determined by the latest edition of "Building Valuation Data" of current average construction value per square foot published by the Southern Building Code Congress International or a written estimate of labor and materials prepared and certified by the contractor. y. Lowest floor means the lowest floor of the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's lowest floor; provided that such enclosure is not built so as to render the structure in violation of the applicable nonelevation design requirement of subsection 5. z. Manufactured home means a structure, transportable in one or more sections, which is built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailers, travel trailers and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property. aa. Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale. bb. Market value of the building, for determining "substantial improvement," means the market value of the building only, excluding land. Market value shall be determined by the most recent appraisal by the county tax assessor or by a certified appraisal report using the comparable sales method, whichever is the greater value. cc. Mean sea level means the average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of this section, the term is synonymous with National Geodetic Vertical Datum (NGVD). dd. National Geodetic Vertical Datum (NGVD), as corrected in 1929, is a vertical control used as a reference for establishing various elevations within the floodplain. ee. New construction means structures for which the start of construction commenced on or after May 5, 1981, the effective date of the initial floodplain management ordinance adopted by the city. The term also includes any subsequent improvements to such structures. ff. New manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after May 5, 1981, the effective date of the initial floodplain management ordinance adopted by the city. gg. Recreational vehicle means a vehicle which is: (1) Built on a single chassis; (2) 400 square feet or less when measured at the largest horizontal projection; (3) Designed to be self-propelled or permanently towable by a light-duty truck; and (4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. hh. Start of construction, for other than new construction of substantial improvements under the Coastal Barrier Resources Act (P.L. 97-348), includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement, or improvement was within 180 days of the permit date. The actual "start" means either the first placement of permanent construction of a structure (including a manufactured home) on a site, such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a structure, whether or not that alteration affects the external dimensions of the structure. ii. Structure means a walled and roofed building that is principally above ground, a manufactured home, a gas or liquid storage tank, and other manmade facilities or infrastructures. jj. Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before-damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. kk. Substantial improvement means any combination of repairs, reconstruction, alteration, addition or improvement to a building, taking place during the life of a building, in which the cumulative "improvement cost" (as defined by this section) equals or exceeds 50 percent of the "market value of the building" (as defined by this section). The market value of the building should be (1) the present appraised value of the building prior to the start of the repair or improvement, or (2) in the case of damage, the value of the building prior to the damage occurring. This term includes structures which have incurred substantial damage, regardless of the actual repair work performed. For the purposes of this definition substantial improvement is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure. The term does not, however, include any project for improvement of a structure to comply with existing state or local health, sanitary, or safety code specifications which have been identified by the code enforcement official and which are solely necessary to ensure safe living conditions. Example. A substantial improvement occurs when the cumulative improvement costs to a building over a period of time exceed 50 percent of the current market value of the building, as shown in the following example: In 1988, a $30,000.00 improvement is made to a $100,000.00 building: $30,000.00 improvement cost divided by $100,000.00 market value of building = 30 percent. 50 percent improvement, which is not a substantial improvement. In 1994, a $45,000.00 improvement is proposed for the same building with a current market value of $143,000.00: $143,000.00 = 1994 building value before proposed $45,000.00 improvement. $30,000.00 improvement in 1988 + $45,000.00 proposed 1994 improvement = $75,000.00 cumulative improvement costs. $75,000.00 cumulative improvement costs divided by $143,000.00 current market value = 52 percent. > 50 percent improvement, which is a substantial improvement. ll. Substantially improved existing manufactured home parks or subdivisions means where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced. mm. Variance means a grant of relief by the zoning board of adjustment to a person from the requirements of this section which permits construction in a manner otherwise prohibited by this section where specific enforcement would result in practical difficulty. nn. Zone A, AO, A1-30, AE, A99 or AH means an area of special flood hazard delineated on the community's flood insurance rate map (FIRM). 3. General provisions. a. Lands to which this section applies. In addition to the other requirements of this section and other ordinances of the City of Birmingham, this section shall apply to all areas of special flood hazard within the corporate limits of the City of Birmingham. b. Basis for establishing the areas of special flood hazard. The areas of special flood hazard identified by the Federal Emergency Management Agency, Federal Insurance Administration through the scientific engineering report entitled "Flood Insurance Study, City of Birmingham, Alabama, Jefferson County," dated September 16, 1980, with accompanying flood insurance rate maps and flood boundary and floodway maps and any revision thereto are adopted by reference and declared to be a part of this section. c. Establishment of development permit. A permit to develop in a flood hazard area, a floodplain development permit, shall be required in conformance with the provision of this section prior to the commencement of any development activities. d. Compliance. No structure or land shall hereafter be located, extended, converted or structurally altered without full compliance with the terms of this section and other applicable regulations. e. Abrogation and greater restrictions. This section is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this section and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail. f. Interpretation. In the interpretation and application of this section, all provisions shall be: (1) Considered as minimum requirements; (2) Liberally construed in favor of the governing body; and (3) Deemed neither to limit nor repeal any other powers granted under state statutes. g. Warning and disclaimer of liability. The degree of flood protection required by this section is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by manmade or natural causes. This section does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This section shall not create liability on the part of the City of Birmingham or by any officer or employee thereof for any flood damages that results from reliance on this section or any administrative decision lawfully made thereunder. h. Penalties for violation. Violation of the provisions of this section or failure to comply with any of its requirements, including violation of conditions and safeguards established in connection with grants of variance or special exceptions, shall constitute a misdemeanor. Any person who violates this section or fails to comply with any of its requirements shall, upon conviction thereof, be fined not more than $500.00 or imprisoned for not more than 180 days, or both, and in addition shall pay all costs and expenses involved in the case. Each day such violation continues shall be considered a separate offense. Nothing herein contained shall prevent the City of Birmingham from taking such other lawful action as is necessary to prevent or remedy any violation. 4. Administration. a. Designation of administrative officers. The director of the planning, engineering and permits department is hereby appointed to administer, interpret and implement the provisions of this section jointly with the director of the planning, engineering and permits department (for general application to the zoning ordinance, see article VII, sections 1 and 2). b. Duties and responsibilities of the administrative officers shall include, but not be limited to the following: (1) The administrative officers shall review all development permits to assure that the permit requirements of this section have been satisfied. (2) The director of the department of planning, engineering and permits shall advise permittee that additional federal and state permits may be required, and if specific federal or state permits are known, require that copies of such permits be provided and maintained on file with the development permit. (3) The director of the department of planning, engineering and permits shall notify adjacent communities and the appropriate authority of the State of Alabama prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency. (4) The director of the department of planning, engineering and permits shall assure that maintenance is provided within the altered or relocated portion of said watercourse so that the measured capacity of the stream channel to carry floodwaters is not diminished. (5) The director of the department of planning, engineering and permits shall verify and record the actual elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved structures, in accordance with subsection 4, part c(2)(a). (6) The director of the department of planning, engineering and permits shall verify and record the actual elevation (in relation to mean sea level) to which the new or substantially improved structures have been floodproofed, in accordance with subsection 4, part c(2)(a). (7) When floodproofing is utilized for a particular structure, the director of the department of planning, engineering and permits shall obtain certification from a registered professional engineer or architect. (8) Where interpretation is needed as to the exact location of the boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the director of the department of planning, engineering and permits shall make the necessary interpretation. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this section. (9) When base flood elevation data has not been provided in accordance with subsection 3, part b, then the director of the department of planning, engineering and permits shall obtain, review, and reasonably utilize any base flood elevation data available from a federal, state or other source, in order to administer the provisions of subsection 5. (10) All records pertaining to the provisions of this section shall be maintained in the offices of the administrative officer and shall be open for public inspection. c. Permit and certification procedures. (1) Application stage. Application for a floodplain development permit shall supplement an application for a building permit, subdivision plat or other development approval and shall be made to the director of the department of planning, engineering and permits on forms furnished by him, prior to any development activities, and may include, but not be limited to plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing and/or proposed structures, fill, storage of materials; drainage facilities, and the location of the foregoing. Specifically, the following information is required: (a) Elevation in relation to mean sea level of the proposed lowest floor (including basement) of all buildings; (b) Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed; (c) Provide a certificate from a registered professional engineer or architect that the nonresidential floodproofed building meets the floodproofing criteria in subsection 5, part b(2); (d) Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. (2) Construction stage. (a) Provide a floor elevation or floodproofing certification after the lowest floor is completed, after placement of the horizontal structural members of the lowest floor. Upon placement of the horizontal structural members of the lowest floor or floodproofing by whatever means, whichever is applicable, it shall be the duty of the permit holder to submit to the director of the department of planning, engineering and permits a certification for the elevation of the lowest floor, floodproofed elevation, or the elevation of the lowest portion of the horizontal structural members of the lowest floor, whichever is applicable, as built, in relation to mean sea level. Said certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for a particular building, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. (b) Any work done prior to submission of the certification shall be at the permit holder's risk. The director of the department of planning, engineering and permits shall review the flood elevation survey data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or failure to make said corrections required hereby, shall be cause to issue a stop work order for the project. d. Variance or modifications. (1) The zoning board of adjustment of the City of Birmingham as established in article VIII of this ordinance shall hear and decide on appeals and request for variances from the requirements of this section. (2) The zoning board of adjustment shall hear and decide appeals when it is alleged there is an error in any requirement, decision or determination made by the administrative officer in the enforcement or administration of this section. (3) Any person aggrieved by the decision of the zoning board of adjustment may appeal such decision in accordance with article VIII, section 6 of this ordinance. (4) Variances may be issued for the repair or rehabilitation of historic structures (see definition) upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure. (5) In passing upon such applications, the zoning board of adjustment shall consider all technical evaluations, all relevant factors, all standards specified in other parts of this section and the: (i) Danger that materials may be swept into other lands to the injury of others; (ii) Danger to life and property due to flooding or erosion damage; (iii) Susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; (iv) Importance of the services provided by the proposed facility to the community; (v) Necessity to the facility of a waterfront location, where applicable; (vi) Availability of alternative locations, not subject to flooding or erosion damage for the proposed use; (vii) Compatibility of the proposed use with existing and anticipated development; (viii) Relationship of the proposed use to the comprehensive plan and floodplain management program for that area; (ix) Safety of access to the property in times of flood for ordinary and emergency vehicles; (x) Expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site; and (xi) Costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical, and water systems, and streets and bridges. (6) Upon consideration of the factors listed above and the purposes of this section, the zoning board of adjustment may attach such conditions to the granting of variances as it deems necessary to further the purposes of this section. (7) Variances shall not be issued within any designated floodway if any increase in flood level during the base flood discharge would result. (8) Variances shall only be issued upon a determination that the variance is the minimum necessary considering the flood hazard to afford relief and in the instance of a historical building, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building. (9) Variances shall only be issued upon: (i) A showing of good and sufficient cause; (ii) A determination that failure to grant the variance would result in exceptional hardship; and (iii) A determination that the granting of the variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public or conflict with existing laws or ordinances of the city. (10) Any applicant to whom a variance or modification is granted shall be given written notice specifying the difference between the base flood elevation and the elevation to which the structure is to be built and stating the cost of flood insurance will be commensurable with the increased risk resulting from the reduced lowest floor elevation. (11) The director of the department of planning, engineering and permits shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency upon request. 5. Provisions for flood hazard reduction. a. General standards. In all areas of special flood hazard the following provisions are required: (1) All new construction and substantial improvements shall be anchored to prevent flotation, collapse, or lateral movement of the structure. (2) All manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement attributable to water loads associated with the base flood. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces. (3) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to damage attributable to water loads associated with the base flood. (4) All new construction or substantial improvements shall be constructed by methods and practices that minimize flood damage. (5) All electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. (6) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system. (7) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters. (8) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. (9) Any alteration, repair, reconstruction, or improvements to a structure which is in compliance with the provisions of this section, shall meet the requirements of "new construction" as contained in this section. (10) Any alteration, repair, reconstruction or improvement to a building which is not in compliance with the provisions of this section, shall be undertaken only if said nonconformity is not furthered, extended or replaced. (11) No development in a floodplain shall include locating or storing toxic chemicals, explosives, buoyant materials, pollutants, or other hazardous or toxic materials that could be injurious to human, animal or plant life, unless elevated one foot above the base flood elevation. Underground storage of fuel, toxic or flammable substances is expressly prohibited in the floodplain. b. Specific standards. In all areas of special flood hazard where base flood elevation data has been provided, as set forth in subsection 3, part b. or subsection 4, part b(9), the following provisions are required: (1) Residential construction. New construction or substantial improvement of any residential structure (or manufactured home) shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movement of floodwaters shall be provided in accordance with standards of subsection 5, part b(2). (2) Nonresidential construction. New construction or substantial improvement of any commercial, industrial or other nonresidential structure shall either have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation or, together with attendant utility and sanitary facilities, be floodproofed so that below the required elevation the structure is watertight with walls substantially impermeable to the passage of water and use structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy. A registered professional engineer or architect shall certify that the standards of this subsection are satisfied. Such certification shall be provided to the official as set forth in subsection 4, part c(2). (3) Elevated buildings. New construction or substantial improvements of elevated buildings that include fully enclosed areas formed by foundation and other exterior walls below the base flood elevation shall be designed to preclude finished living space and designed to allow for the entry and exit of floodwaters to automatically equalize hydrostatic flood forces on exterior walls. (a) Designs for complying with this requirement must either be certified by a professional engineer or architect and meet the following minimum criteria: (i) Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding; (ii) The bottom of all openings shall be no higher than one foot above grade; and (iii) Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwaters in both directions. (b) Electrical, plumbing, and other utility connections are prohibited below the base flood elevation; (c) Access to the enclosed area shall be the minimum necessary to allow for parking of vehicles (garage door) or limited storage of maintenance equipment used in connection with the premises (standard exterior door) or entry to the living area (stairways or elevator); and (d) The interior portion of such enclosed area shall not be partitioned or finished into separate rooms. (4) Standards for manufactured homes and recreational vehicles. (a) All manufactured homes placed, or substantially improved, on individual lots or parcels, in expansions to existing manufactured home parks or subdivisions, or in substantially improved manufactured home parks or subdivisions, must meet all the requirements for new construction, including elevation and anchoring. (b) All manufactured homes placed or substantially improved in an existing manufactured home park or subdivision must be elevated so that: (i) The lowest floor of the manufactured home is elevated no lower than one foot above the base flood elevation; (ii) The manufactured home chassis is supported by reinforced piers or other foundation elements of at least an equivalent strength, of no less than 36 inches in height above grade; (iii) The manufactured home must be securely anchored to the adequately anchored foundation system to resist flotation, collapse and lateral movement; or (iv) In an existing manufactured home park or subdivision on which a manufactured home has incurred "substantial damage" as the result of a flood, any manufactured home placed or substantially improved must meet the standards of subsection 5, parts b(1) and (3) above. (c) All recreational vehicles placed on sites must either: (i) Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use; or (ii) The recreational vehicle must meet all the requirements for new construction, including anchoring and elevation requirements of subsection 5, part a(2) and part b(1) above. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices and has no permanently attached structures. c. Standards for floodways. Located within areas of special flood hazard established in subsection 3, part b, are areas designated as floodways. Since the floodway is an extremely hazardous area due to the velocity of floodwaters which carry debris, potential projectiles and has erosion potential, the following provisions shall apply: (1) Prohibit encroachments, including fill, new construction, substantial improvements and other developments unless certification by a registered professional engineer is provided demonstrating that encroachments shall not result in any increase in flood levels during occurrence of the base flood discharge. (2) If subsection 5, part c(1) is satisfied, all new construction and substantial improvements shall comply with all applicable flood hazard reduction provisions of subsection 5. (3) Prohibit the placement of manufactured homes except in an existing manufactured home park or subdivision. A replacement manufactured home may be placed on a lot in an existing manufactured home park or subdivision provided the anchoring standards of subsection 5, part a(2), and the elevation standards of subsection 5, part b(1) and the encroachment standards of subsection 5, part c(1), are met. d. Standards for streams without established base flood elevation and/or floodways. Located within the areas of special flood hazard established in subsection 3, part b, where streams exist but where no base flood data has been provided or where base flood data has been provided without floodways, the following provisions apply: (1) No encroachments, including fill material or structures shall be located within areas of special flood hazard, unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood more than one foot at any point within the community. The engineering certification should be supported by technical data that conforms to standard hydraulic engineering principles. (2) New construction or substantial improvements of buildings shall be elevated or floodproofed to elevations established in accordance with subsection 4, part b(9). e. Standards for subdivision proposals and other new developments. (1) All subdivision proposals and other proposed new developments, including manufactured home parks or subdivisions, shall be reviewed by the administrative officer to determine whether such proposals will be reasonably safe from flooding. If a subdivision proposal or other proposed new development is in a floodprone area, any such proposals shall be prepared by a professional engineer and be reviewed for conformance with the following standards: (a) All such proposals shall be consistent with the need to minimize flood damage within the floodprone area; (b) All public utilities and facilities, such as sewer, gas, electrical and water systems shall be located and constructed to minimize flood damage; (c) Adequate drainage shall be provided to reduce exposure to flood hazards; and (2) All subdivision plat proposals and other proposed site plans for new development in a floodprone area, including manufactured home parks or subdivisions, shall have floodplain zones delineated and base flood elevation data provided by a registered land surveyor or professional engineer.
(Ord. No. 95-56, 3-21-1995)
Ask a question about Birmingham law
Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.