§ 4-7-41 — Land-disturbing activity responsibilities

Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 4-7-41

Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/bee284a4-33f7-4f96-9d3f-00885ff7aaca

Sec. 4-7-41. - Land-disturbing activity responsibilities.

(a) The persons proposing to conduct any land-disturbing activity, or an agent, contractor or other representative of such person, must contact the city engineer at least five business days before commencement of the land-disturbing activity to advise the city engineer of the commencement of such land-disturbing activity, unless, for good cause shown, the city engineer permits such person, contractor, agent or other representative to contact him nearer to the date of the commencement of such land-disturbing activity. (b) Other than land-clearing activities required to install the appropriate BMP in accordance with BMP plans, any downslope erosion and sediment control measures, on-site stream channel protection and upslope diversion of drainage required by the BMP plan shall be in place and functional before any clearing or earthwork begins, and shall be constructed and maintained throughout the construction period. Temporary measures may be removed at the beginning of the workday, but shall be replaced at the end of the workday. (c) The angle for graded slopes and fills shall be no greater than the angle, which can be retained by vegetative cover or other adequate erosion control devices or structures. Any slope or fill which has been graded shall, within 14 days of the completion of such grading or the completion of any phase of grading, be planted or otherwise provided with ground cover, materials, devices or structures sufficient to restrain erosion. The BMPs shall remain in place in accordance with the BMP plan until the graded slope or fill is stabilized. (d) Adequate protective measures shall be provided for the containment of hazardous substances and any other materials which may pollute the MS4, including petroleum products, lubricants and paint. (e) All control measures shall be checked, and repaired as necessary, every two weeks in dry periods and within 24 hours after any rainfall at the site of .75 inch within a 24-hour period. During prolonged rainfalls, daily checking and, if necessary, repairing shall be done. The permittee shall maintain written records of such checks and repairs, which records shall be subject to the inspection of the city engineer at any reasonable time. (f) A site plan, accompanied by a written description of BMPs which are shown on the site plan, and a schedule of implementation during land-disturbing activities and construction shall be furnished to the city engineer prior to the commencement of any land-disturbing activities. (g) A description of, and procedures for, proper storage, handling and disposal of construction materials stored on-site which could contribute to the pollutant loading to the MS4, shall be furnished to the city engineer prior to the commencement of any land-disturbing activities. (h) There shall be no distinctly visible floating scum, oil or other matter contained in the stormwater discharge. The stormwater discharge to an MS4 must not cause an unnatural color (except dyes or other substances discharged to an MS4 for the purpose of environmental studies and which do not have a harmful effect on the bodies of water within the MS4) or odor in the community waters. The stormwater discharge to the MS4 must result in no materials in concentrations sufficient to be hazardous or otherwise detrimental to humans, livestock, wildlife, plant life or fish and aquatic life in the community waters. (i) The owner shall be responsible for the ongoing observation, review and field issuance of reports in the actual land-disturbing activity. This responsibility shall include, but need not be limited to, testing, inspection and issuing of field reports as to the establishment of line, grade and drainage of the project area. Civil engineering record documents shall be preserved in accord with state law. (j) The city engineer may require inspection and testing by an approved testing agency if he determines that such inspection and testing is necessary because unusual, complex or hazardous conditions exist on or adjacent to the site. The cost of such inspection and testing shall be the responsibility of the owner. The testing agency's responsibility shall include, but is not limited to, inspection and issuance of affidavits concerning the inspection of cleared areas and benches to receive fill, and the compaction of fills.

(Ord. No. 99-131, § 1(300), 7-15-1999)