§ 4-9-22 — Definitions
Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 4-9-22
Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/f70325ed-d52f-48d7-b7a6-977b08dec342
Sec. 4-9-22. - Definitions.
Alabama Department of Environmental Management (or "ADEM") means the state regulatory agency, created under the Code of Alabama (1975) § 22-22A-1, et seq., responsible for administering and enforcing the stormwater laws of the United States of America and the state. Brownfield means real property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of hazardous substance, pollutant, or contaminant. CFR means the Code of Federal Regulations. City means the City of Birmingham, Alabama. CWA means the Clean Water Act (formerly referred to as the Federal Water Pollution Control Act or Federal Water Pollution Control Act Amendments of 1972) Pub. L. 92-500, as amended Pub. L. 95-217, Pub. L. 95-576, Pub. L. 96-483 and Pub. L. 97-117, 33 U.S.C. 1251 et seq. Design manual means the "City of Birmingham Post-Construction Stormwater Design Manual". Director means the director of the department of planning, engineering and permits, or his/her designated representative. Federal Emergency Management Agency (or "FEMA") means the federal agency established in 1979 by executive order of the President of the United States to coordinate the federal government's role in preparing for, preventing, mitigating the effects of, responding to, and recovering from all domestic disasters, whether natural or man-made, including disasters caused by flooding. Green infrastructure practice means systems and practices that use or mimic natural processes to infiltrate, evapotranspire (the return of water to the atmosphere either through evaporation or by plants), or reuse of stormwater or runoff on the land development where it is generated. Green infrastructure practices identified in the design manual include, but are not limited to, bioretention area, cistern, downspout disconnection, dry water quality swale, enhanced swale, green roof, infiltration trench, permeable pavement, reforestation, sheet flow, and urban bioretention. Impervious surface means surfaces composed of any material that impedes or prevents the natural infiltration of water into the soil. Impervious surfaces shall include, but are not limited to, roofs, streets, driveways, parking areas, patios, sidewalks, tennis courts, solid decks, other concrete or asphalt paved areas, and any areas used (or to be used) as a vehicle driveway or travelway or for parking, whether paved, gravel, or other compacted material, unless such material is (or has been) specifically designed, installed, and maintained to allow water to pass beneath the surface. For example, permeable pavers, asphalt, and concrete are not impervious surfaces. Land disturbance (or "land disturbing activity") means any change in the land which may result in soil erosion or the movement of sediment by water, wind or other means of transport, including, but not limited to, clearing, grubbing, grading, dredging, compaction, excavation, dumping, discharging, alteration of natural or existing topography, moving, placing or storing fill material, or any other means that causes disturbance of soil. Maintenance manual means the "City of Birmingham Property Owner's Guide to BMP Maintenance". Municipal separate storm sewer system (or "MS4") means a conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains): (i) Owned or operated by the City of Birmingham, Alabama; (ii) Designed or used for collecting or conveying stormwater; (iii) Which is not a combined sewer; and (iv) Which is not part of a Publicly Owned Treatment Works (POTW) as defined in ADEM Administrative Code 335-6-6-.02(nn). Offsite means outside the property lines of a land development for which a post construction stormwater permit must be, will be, or has been obtained. Onsite means within, or inside, the property lines of the land development for which a post construction stormwater permit must be, will be, or has been obtained. New development means any track, lot, or parcel of land, or combination of contiguous tracts, lots, or parcels of land which are in one ownership, or which are owned by two or more parties, and for which improvements of the land from a natural, entirely unimproved, condition are proposed or planned as a unit, subdivision, or project. New development includes land that has been used previously for livestock or crops, or has been previously grubbed, stripped, graded, and/or revegetated from a natural, entirely unimproved condition, provided that impervious surfaces were not previously placed or demolished thereon. Performance standard (or "design standard") means the benchmark against which the design of the land development, the stormwater drainage system, or a specific component of the system is measured. A design must meet the performance standard for it to be deemed compliant with the standard. Performance standards are authorized and established by this chapter and defined in detail in the design manual. Person means any individual, association, organization, partnership, firm, corporation, or other entity recognized by law and acting as the owner or owner's agent of a premises or as a lessee of a premises. All persons, natural or artificial, including, but not limited to, any individual, partnership, association, society, joint stock company, firm, company, corporation, institution, trust, other legal entity, business organization, or other governmental entity and any successor, representative, responsible corporate officer, agent, or agency of the foregoing. Pollutant means anything which causes or contributes to pollution. Pollutants may include, but are not limited to: sediment, oils and greases, detergents, fertilizers, pesticides, herbicides, metals, hazardous chemicals, materials that cause changes in pH of stormwater, dredged spoil, solid waste, incinerator residue, sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt, and industrial, municipal, and agricultural waste discharged into water. The term also includes any other effluent characteristics specified in the city's NPDES permit. Post construction stormwater practice means, generally, any activity or practice or drainage system that is designed and constructed to manage post construction stormwater quality or provide flood control whether alone or in combination with other post construction stormwater practices. Green infrastructure practices are considered post construction stormwater practices. Pre-concept conference is a meeting between the owner of a proposed (or possibly proposed) land development, the consultants working on his/her behalf to design the land development, and the chief civil engineer - watersheds, to examine the existing (pre-construction condition) hydrology of said land development for the purpose of identifying opportunities or limitations to the use of low impact development practices and green infrastructure practices, and to generally evaluate the practices, permits, and regulations that may be necessary to effectively manage stormwater after development of the land. Pre-concept sketch is a written set of documents, narratives, and maps that provides a detailed characterization of the existing hydrology at the location of a proposed land development subject to this chapter. Pre-construction condition is the existing condition of the property at the time the application for a post-construction stormwater permit is submitted, prior to any clearing, grubbing, grading, construction, or demolition done in preparation for the proposed new development or redevelopment. For new land developments, the pre-construction condition will be an undeveloped condition. For redevelopments, the pre-construction condition will be a developed condition. In the event that demolition of pavement or structures has already occurred in preparation for the proposed redevelopment when the application for a post-construction stormwater permit is received, the pre-construction condition shall be the previously developed condition of the property, as obtained from aerial photography, historical mapping, or other reliable source of land cover information. Premises means any building, lot, parcel of land, or portion of land whether improved or unimproved including facilities, adjacent sidewalks, and parking strips located thereon for all land uses. Record drawing is a written, detailed set of documents, narratives, maps, affidavits, and reports that accurately indicate the as-constructed condition of the individual and collective stormwater drainage systems and post construction stormwater practices on a land development subject to this chapter. Approval of a record drawing by the director is required to terminate a post construction stormwater permit. Redevelopment means the expansion, renovation, rebuilding, demolition and construction, or other further improvement of any previously improved tract, lot, or parcel of land, or combination of contiguous tracts, lots, or parcels of land which are in one ownership, or which are owned by two or more parties, are proposed or planned as a unit, subdivision, or project. "Previously improved" includes, but is not limited to, the prior placement, construction, and/or demolition of buildings, roadways, sidewalks, parking areas, and other areas of concrete, asphalt, gravel, packed gravel, or other materials on the subject tract(s), lot(s) or parcel(s). Stormwater is defined at 40 CFR Part 122.26(b) (13) and means stormwater runoff, snow melt runoff, and surface runoff and drainage. Stormwater drainage system means the system of roadside drainage, roadside curbs and gutters, curb inlets, swales, catch basins, manholes, gutters, ditches, pipes, lakes, ponds, sinkholes, channels, creeks, streams, storm drains, post construction stormwater practices, and similar conveyances and facilities, both natural and manmade, located within the city which are designated or used for collecting, storing, or conveying stormwater, or through which stormwater is collected, treated, stored or conveyed, whether owned or operated by the city or other person. Stormwater management plan is a written, detailed set of documents, narratives, and maps containing the proposed design, design calculations, construction specifications, affidavits, and reports of the individual and collective stormwater drainage systems and post construction stormwater practices on a specific, proposed land development subject to this chapter. Approval of a stormwater management plan by the director is required to obtain a post construction stormwater permit.
(Ord. No. 19-31, § 1, 3-29-2019)
Ask a question about Birmingham law
Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.
