Sec. 4-9-82. - Maintenance and integrity during construction.
(a) The following requirements apply during clearing, grading, and construction to green infrastructure practices that will operate, after their construction, by infiltration and evapotranspiration: (1) To avoid soil compaction and pollution, areas where green infrastructure practices will be, or are, located shall be protected from encroachment by heavy equipment, vehicles, and construction materials storage at all times. i. Said areas shall be cordoned-off with a highly visible barrier, such as orange construction fencing, and shall not be encroached upon or otherwise disturbed unless they are being established, constructed, restored, or enhanced as provided for in an approved stormwater management plan. Protection measures shall be installed prior to, or if more practical, during clearing and grubbing of the land development. ii. Said areas shall be clearly identified on the stormwater management plan, on the erosion and sediment control plan, and on all construction drawings, and marked with the statement "Green Infrastructure Practice. Do not disturb." Temporary protection measures to be used during construction shall be shown on the stormwater management plan. (2) The use of green infrastructure practices as sediment traps or for any other erosion prevention and sediment control measure is expressly prohibited. Nor shall sediment from any area of the land development be allowed to discharge into, or through, areas where green infrastructure practices will be located. (3) Erosion prevention and sediment control measures to be used during construction shall be shown on the stormwater management plan. Said measures shall not be removed until construction in the area that discharges stormwater to the practice is fully completed, and after 100 percent of the pervious surfaces in said area are fully vegetated or otherwise permanently stabilized to prevent soil erosion. (4) Where encroachment, sedimentation, pollution, or other adverse condition is known or suspected as a result of clearing, grading, or construction, the director may require soil infiltration testing, soil amendment, or other corrective action(s) to confirm or restore infiltration rates to design requirements. (b) Owner(s) of individual and collective stormwater drainage systems and post construction stormwater practices shall, at the completion of construction, inspect said systems and practices for sediment, trash, debris, or damage. Issues noted shall be corrected prior to submittal of the record drawing. Sediment, trash, and debris discharged during construction to individual and collective stormwater drainage systems shall be entirely removed, such that the system is free of blockage and operating at its fully functional design capacity, as indicated in the approved stormwater management plan. (c) Post construction stormwater practices, excluding green infrastructure practices, may be used as sediment traps or other soil erosion and sediment control measures, if such use is approved in the soil erosion and sediment control plan. When such use is approved: (1) Sediment discharged to a post construction stormwater practice during construction shall be removed after construction in the area that discharges stormwater to the practice is fully completed, and after 100 percent of the pervious surfaces in said area are fully vegetated or otherwise permanently stabilized to prevent soil erosion; (2) The use shall be clearly noted in the stormwater management plan, and the stormwater management plan shall indicate the sequence and method which will be used to ensure that the post construction stormwater practice functions as indicated by the approved design. (d) Individual and collective stormwater drainage systems and post construction stormwater practices shall not, at any time, be used for storage of construction or demolition-related chemicals or waste, either temporarily or permanently. (e) The director may, alone or in addition to other enforcement actions authorized by this chapter, withhold termination of a stormwater management plan pending satisfactory completion of corrective action(s) for failure to comply with any of the provisions of this section.
(Ord. No. 19-31, § 1, 3-29-2019)
Ask a question about Birmingham law
Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.