§ 7-308 — Special use permit requirements for macro wireless facilities
City Code of the City of Decatur, Alabama (Codified through Ordinance No. 24-4600, adopted December 16, 2024. (Supp. No. 37)) · Decatur City Code § 7-308
Corpus is an independent public-information project, not the official City of Decatur website. Stable reference: corpuslaw.us/code/303c664a-e4c5-461b-a1c1-40f7b724e763
Sec. 7-308. - Special use permit requirements for macro wireless facilities.
(a) General application requirements: The following items are considered general application requirements and shall be included in all applications for a special use permit: (1) The name, address, phone number and e-mail address of the person preparing the application. (2) The name, address, and phone number of the property owner and the applicant, including the legal name of the applicant. If the owner of the structure is different than the applicant, the name and all necessary contact information shall be provided. (3) The postal address and tax map parcel number of the property. (4) The zoning district or designation in which the property is situated. (5) For all new facilities, a list of the specific frequency bands to be initially activated immediately upon completion of construction and a copy of the FCC licenses applicable for all the frequency bands licensed to the carrier to provide service in the city. (6) All applications shall include written commitment statements that: a. the applicant's facility shall always without exception be maintained in a safe manner, and in compliance with all conditions of the special use permit, as well as all applicable and permissible local codes, ordinances, and regulations and all applicable city, State and Federal laws, rules, and regulations, unless specifically granted relief by the council in writing; b. the construction of the facility is legally permissible, including, but not limited to the fact that the applicant is licensed to do business in the State. (7) Certified detailed construction drawings, including but not limited to the following information: a. the size of the property footprint on which the structure to be built or attached to is located, stated both in square feet and lot line dimensions, and a certified boundary survey completed by a professional land surveyor showing the location of all lot lines and rights-of-way. b. location of the nearest residential structure and habitable structure. c. the location, size and height of all existing and proposed structures on the property. d. enclosures and cabinets on the property on which the structure is located that are related to the subject of the application. e. a site plan to-scale showing the footprint of the support structure and the type, location and dimensions of access drives, landscaping and buffers, fencing, underground utilities of any kind and any easements. f. elevation drawings showing the profile or the vertical rendition of the facility and identifying all existing and proposed attachments and all related fixtures, structures, appurtenances and apparatus, including the height above the existing grade, materials, colors and lighting. g. proposed electrical and grounding plans for the facility. (8) The azimuth, size, top of antenna height, locations of all proposed and existing antennas on the support structure, and the height of the tip of any lightning arrestor. (9) The type and manufacturer of the tower and a rigorous structural analysis and report, including the calculations, certified by a professional engineer licensed in the State and proving the structure's capability to safely accommodate the facilities of the applicant. (10) An ANSI/TIA-222 maintenance and conditions assessment report regarding the physical condition of the facility and its components, using the most recently adopted version of ANSI/TIA-222. The report shall contain tolerances including but not limited to guy tensions if applicable, plumb, twist, slip splices, and take-up devices. No special use permit shall be issued for any wireless facility or related equipment where the structure being attached to is in need of safety-related remediation to comply with the requirements of this article and other adopted standards of the city, unless and until all remediation work that is deemed needed has been completed or a schedule for the remediation work has been approved by the city. (11) For telecommunications towers taller than thirty-three (33) feet in height, a completed and signed checklist for categorical exclusion of radio frequency electromagnetic emissions. If the modification, co-location or construction of a new wireless facility is not categorically excluded based on the Federal Communications Commission's rules, the applicant shall provide a compliance letter to the city and shall remain in full compliance with all requirements set forth by the latest edition of the Federal Communications Commission (FCC) OET Bulletin 65. In certain instances, the city may deem it appropriate to have an on-site RF survey of the facility done after the construction or modification of the facility. Such survey shall be done under the observation and direction of the city or its designee, and an un-redacted copy of the survey results along with all calculations provided, prior to the issuance of a certificate of compliance. (12) A signed statement that the applicant will expeditiously remedy any physical or RF interference with other wireless devices or services. (13) Cut sheets or specifications for all equipment to be installed/mounted on the structure. (b) Co-location application requirements: In addition to the requirements set forth in subsection (a), these items shall be included in the application for a special use permit for co-locations on existing structures: (1) A copy of the lease with the owner of the structure, and the landowner if different than the structure owner, and if applicable a signed letter of agency granting authorization to represent and commit for the party represented. If the applicant owns the site, a copy of proof of ownership is required. (2) The frequency, modulation and class of service of radio or other transmitting equipment. (3) Transmission and maximum effective radiated power of the antenna(s). (4) Direction of maximum lobes and associated radiation of the antenna(s). (5) If requested by the city, to-scale photographic simulations of the Facility "before and after construction" from key viewpoints inside of the City as may be appropriate and required and a map showing the locations of where the photos were taken and the distance(s) of each location from the proposed structure. Guidance will be provided concerning the appropriate key viewpoints on an individual application basis. (6) An unredacted copy of the applicants certificate of liability insurance. (c) New wireless structures and substantial modification requirements: In addition to the requirements set forth in subsections (a) and (b), the following shall be included in the application for a special use permit for new wireless support structures and substantial modifications of support structures: (1) The applicant for a new tower shall submit clear and convincing technical evidence by a wireless service provider justifying the technical need for the proposed height of the facility and the need for such, to the exclusion of all reasonable alternatives. Evidence in the form of propagation studies must include the modeling data and assumptions used to produce the studies on a form to be provided by the city. (2) The applicant shall disclose in writing any agreement in existence prior to submission of the application that would limit or preclude the ability of the applicant to share space on the new tower. (3) If a modification of a facility is needed whereby the height, profile or size of the facility is increased, or construction is needed outside the permitted compound or property, a detailed narrative explaining what changes are needed and why they are needed. (4) The type of support structure, the number of antenna arrays proposed to be accommodated and a certified structural report, including all calculations demonstrating the facility's capacity to accommodate the required number of antenna arrays for which the structure must be designed. (5) A copy of the foundation design, including a geotechnical sub-surface soils investigation report and foundation design recommendation for the tower or other structure. (6) A written copy of an analysis completed by a qualified individual or organization to determine if the proposed wireless telecommunications facility is in compliance with Federal Aviation Administration Regulation Part 77 and if it requires lighting. Unless already lighted, this requirement shall also be for any facility where the application proposes to increase the height of the facility. If this analysis determines that an FAA determination is required, then all filings with the FAA, all responses from the FAA and any related correspondence shall be provided with the application. (7) A narrative description of what will be done to minimize the visual impact. The city expressly reserves the right to require the use of stealth or camouflage techniques. (8) For a new tower or other new support structure, or for a substantial modification, the applicant shall be required to submit clear and convincing evidence that a new tower or support structure or the substantial modification is the only option within one-half (½) mile of the proposed new tower or support structure that will enable the provision of wireless services within the intended service area. (9) In order to better inform the public, in the case of a new tower, the applicant shall hold a "balloon test" or erect a story pole, prior to the initial public hearing on the application. The balloon test shall be based upon the fact and circumstances of the application. a. The applicant shall arrange to fly, or raise upon story pole, a minimum of a four-foot in diameter, brightly colored balloon at the maximum height of the proposed new tower. b. At least fourteen (14) days prior to the conduct of the balloon test, a sign shall be erected so as to be clearly visible from the road nearest the proposed site and shall be removed no later than fourteen (14) days after the conduct of the balloon test. The sign shall be at least two (2) feet by three (3) feet in size. Sign shall be placed off, but as near to, the public right-of-way as is possible. Sign shall contain the times and date(s) of the balloon test and contact information. c. The dates, (including a second date, in case of poor visibility or wind in excess of fifteen (15) mph on the initial date) times and location of this balloon test shall be advertised by the applicant seven (7) and fourteen (14) days in advance of the first test date in a newspaper with a general circulation in the city and as agreed to by the city. The applicant shall inform the city in writing of the dates and times of the test, at least fourteen (14) days in advance. The balloon shall be flown for at least four (4) consecutive hours between 10:00 am and 2:00 p.m. on the dates chosen. The primary date shall be on a week-end, but the second date, in case of poor visibility on the initial date, may be on a week day. A report with photos from various locations of the balloon and to-scale superimposed photo simulations of the facility when completed shall be provided with the application. d. The applicant shall notify all property owners and residents located within one thousand (1,000) feet of the nearest property line of the subject property of the proposed construction of the tower and wireless facility and of the date(s) and time(s) of the balloon test. Such notice shall be provided at least fourteen (14) days prior to the conduct of the balloon test and shall be delivered by registered mail. The applicant shall bear all costs associated with said notification. (10) The owner of a tower or other support structure, and his/her successors in interest, shall negotiate in good faith for the shared use of the facility by other wireless service providers, and shall: a. Respond within sixty (60) days to a request for information from a potential shared-use applicant; b. Negotiate in good faith concerning future requests for shared use of the new wireless telecommunications facility by other telecommunications providers. c. Allow shared use of the new wireless telecommunications facility if another telecommunications provider agrees in writing to pay reasonable charges. d. Understand that failure to abide by the conditions outlined above may be grounds for revocation of the special use permit. (11) The applicant shall provide a landscaping and buffer plan in writing and a visual rendering demonstrating how it shall effectively screen from view the bottom fifteen (15) feet of the facility and all related equipment and structures associated with the facility. Landscaping and buffers shall be in accordance with the city zoning ordinances. For towers located within one thousand (1,000) feet of a residential area, the city may require wider landscape buffers and other items such as decay resistant, solid wood fences, earth berms, and brick or masonry walls in addition to the security fence. All fencing, walls, and landscaping shall be kept in good condition and repair and maintained in a neat manner by the owner of the tower. (12) Co-location on an existing structure is not reasonably feasible if the co-location is technically or commercially impracticable or the owner of the structure is unwilling to enter into a contract for its use. Clear and convincing evidence to support such claims shall be submitted with an application. (13) Any required permits or other related documents shall not be issued for construction of a new tower or other support structure until there is an application filed for or by a specific carrier that documents that the facility is necessary for that carrier to provide service in the intended service area primarily within the city and that a less visually intrusive option co-location on an existing structure is technologically impracticable.
(Ord. No. 19-4351, § 1, 4-8-19)
Ask a question about Decatur law
Corpus searches the Decatur sections it holds and shows the ones that match, with their citations. Free, no sign-in.
