§ 102-372 — Existing gravity grease interceptor design/installation and requirements
Code of Ordinances of the City of Dothan, Alabama (Codified through Ordinance No. 2026-96, enacted April 21, 2026. (Supp. No. 67)) · Dothan Code of Ordinances § 102-372
Corpus is an independent public-information project, not the official City of Dothan website. Stable reference: corpuslaw.us/code/2bf1e8b4-eadd-47d6-a8b1-6d26452c7759
Sec. 102-372. - Existing gravity grease interceptor design/installation and requirements.
Any existing FSE, upgrading of an existing FSE, change of ownership of existing FSE or FSE applying for a business license, having an existing gravity grease interceptor (GGI), will be required to have the interceptor completely pumped and inspected by the City of Dothan's FOG Program personnel for suitability to perform its intended duties, for acceptable inlet and outlet plumbing components, for proper access openings over all chambers, and for acceptable baffle configuration/plumbing. The aforementioned pump out inspection will be waived if the existing GGI passed an inspection in compliance with section 102-382(a) within a previous 12-month time period. As part of the inspection, the City of Dothan's FOG Program personnel may conduct a video inspection of the inside of the interceptor. Existing gravity grease interceptors installed prior to the adoption of this FOG ordinance and not in compliance with section 102-376 but able to meet the requirements of section 102-372(1) through (6), at the discretion and approval of the city may be modified in accordance with section 102-372(7). Food service establishments required by the City of Dothan to have gravity grease interceptor FOG remediation, but having none or an interceptor deemed insufficient by the city and not allowed to be rebuilt/modified in place, shall meet the requirements of section 102-376. Under certain circumstances, the required interceptor size and location may necessitate special exceptions. Allowances for alternative GCE may be approved, provided prior approval of unit type, size, location, etc. is obtained from the City of Dothan's FOG Program Coordinator. Any gravity grease interceptor(s) installed after the adoption of the FOG ordinance shall comply with design and installation requirements of section 102-376. Criteria for consideration by the city as an acceptable gravity grease interceptor existing or installed prior to adoption of this FOG ordinance and not meeting the requirements of section 102-376 of the FOG ordinance is as follows: (1) Capacity and condition. Existing gravity grease interceptors installed prior to the adoption of this FOG ordinance shall have a minimum of 1,000 gallons capacity and shall be found to be in proper working order as determined by the City of Dothan's FOG Program Coordinator or their designee. Any existing gravity grease interceptor in this category not meeting these conditions shall require the installation of a gravity grease interceptor meeting the requirements of section 102-376. (2) Piping. a. The inlet piping shall enter the receiving chamber a minimum of 2½ inches above the invert of the outlet piping. b. On the inlet pipe inside the receiving chamber, a sanitary tee of the same size pipe in the vertical position with the top unplugged shall be provided as a turndown. A pipe (nipple) of the same size as the tee shall be installed in the top of the tee with the top of the nipple open. A pipe installed in the bottom of the tee shall extend to a point of two-thirds the depth of the water level. The inlet tee shall be made of Schedule 40 PVC or equivalent material. c. The outlet piping shall be no smaller than the inlet piping, but in no case smaller than four inches diameter. d. The outlet piping shall contain a tee installed vertically with a pipe (nipple) installed in the top of the tee, with the top of the nipple open. A pipe installed in the bottom of the tee shall be made of a non-collapsible material and extend to 12 inches above the tank floor. Minimum materials requirement for the outlet piping is Schedule 40 PVC. (3) Baffles. a. The interceptor shall have a non-flexing (i.e. concrete, steel, etc.) baffle extending from the floor to a level above of the outlet piping. An existing gravity grease interceptor having no baffle(s) present or hanging baffle(s) that are open or baffle(s) not attached at the bottom will not be acceptable. b. If inverted 90-degree sweeps or tees are used to convey liquid from the inlet to outlet side of the interceptor, the baffle shall have an inverted 90-degree sweep(s), or schedule 40 PVC tee(s), fitting at least equal in diameter size to the inlet piping, but in no case less than four inches. The bottom of the sweep(s) or tee(s) shall be placed in the vertical position of the inlet compartment 12 inches above the floor. If a tee is used in lieu of a sweep, a pipe nipple of the same size as the tee shall be installed in the top of the tee and extend to the same height reached by the top nipple installed on the inlet and outlet tee. The nipple shall remain open. A pipe installed in the bottom of the tee shall extend to 12 inches above the tank floor. c. In lieu of a sweep or tee through the baffle, slotted designs will be acceptable for existing gravity grease interceptors to convey liquid from the inlet to outlet side of the interceptor. d. The inlet compartment shall be two-thirds of the total liquid capacity with the outlet compartment at one-third liquid capacity of the interceptor. (4) Access openings (manholes). a. Access to gravity grease interceptors shall be provided by a minimum of one manhole per interceptor division (baffle chamber/compartment) and be of 24-inch minimum dimension terminating one inch above finished grade with cast iron frame and cover. One manhole shall be located above the inlet tee hatch and the other manhole shall be located above the outlet tee hatch. A minimum of 24 inches of clear opening above each manhole access shall be maintained to facilitate maintenance, cleaning, pumping, and inspections. b. Access openings shall be mechanically sealed and gas tight to contain odors and bacteria, to exclude vermin and ground water, and in a manner that permits regular reuses. c. The manholes shall be accessible for inspection by the city. (5) Location. Gravity grease interceptors shall be located so as to be readily accessible for cleaning, maintenance, and inspections. They should be located close to the fixture(s) discharging to the interceptor. Grease interceptor access manholes shall never be paved over, covered by landscaping, or have any other hindrances not allowing access. (6) Construction material. Grease interceptors shall be constructed of sound durable materials, not subject to excessive corrosion/decay, and shall be water and gas tight. (7) Rebuilding/modifying in place. a. An existing gravity grease interceptor having a minimum of 1,000 gallons capacity and found by the City of Dothan's FOG Program personnel to be functional, but having unacceptable access openings, baffle configuration, or plumbing, may be modified in place to an acceptable configuration as outlined in section 102-372(2) through (4) by rebuilding/modifying it in-place as set forth in section 102-372(7). The FOG program coordinator reserves the right to require additional gravity grease interceptor capacity and/or the installation of a gravity grease interceptor(s) meeting the requirements of section 102-376. b. If the gravity grease interceptor's baffle is not acceptable (no baffle or hanging baffle), the baffle may be modified in-place to an acceptable configuration, generally as given in section 102-372(3) or an interceptor meeting the requirements of section 102-376 shall be installed. The baffle shall extend above level of the outlet pipe. c. If the interceptor does not have compliant access openings over each compartment, these shall be added in compliance with section 102-372(4). (8) All new FSEs in existing buildings applying for a business license and having an existing gravity grease interceptor shall meet the requirements of section 102-372 or section 102-376 as required by the city prior to securing the signature of the FOG program coordinator for issuance of a business license.
(Ord. No. 2015-366, § 1, 12-15-15)
Ask a question about Dothan law
Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.
