For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 102-64.1 — Temporary electric service/rate class; designation ET/E4

Code of Ordinances of the City of Dothan, Alabama (Codified through Ordinance No. 2026-96, enacted April 21, 2026. (Supp. No. 67)) · Dothan Code of Ordinances § 102-64.1

Corpus is an independent public-information project, not the official City of Dothan website. Stable reference: corpuslaw.us/code/910bb75a-f8d4-49ae-990d-ff44a43ac04e

Sec. 102-64.1. - Temporary electric service/rate class; designation ET/E4.

(a) Applicability. Temporary electric service rates ET/E4 is applicable for temporary electric service during construction and/or for nonresidential power service to special short-term events where the maximum 15-minute integrated demand does not exceed 120 kW. Service to more than one premises is not to be combined nor shall it be shared with or resold to others. This rate is not available to customers with renewable behind the meter generation. (b) Character of service. The service shall be single-phase service at the nominal secondary voltage 120/140. All service voltages, types of metering and meter locations shall be approved by the utilities director or the director's designee prior to connection. Any customer receiving service at two different points will be considered as two separate customers. The type of metering is to be specified by the city. (c) Monthly rate. Effective with the January 2016 billing cycle, the monthly rate shall be as follows: Temporary Electrical (ET/E4) Customer charge | $25.00 0—5,000 kWhs | $0.10180 per kWh 5,001—10,000 kWhs | $0.09680 per kWh All over 10,000 kWhs | $0.09180 per kWh Plus, to this rate shall be added a power cost adjustment (section 102-74). (d) Rate adjustments and taxes. The retail rate in subsection (c) of this section, as charged by the city, shall be adjusted automatically and simultaneously with wholesale rate adjustments. Any additional charges levied by the state or federal authorities, such as sales taxes, will be passed on to the customer in addition to the rate schedule in subsection (c) of this section. (e) Minimum charge. The minimum charge for any part of the monthly bill shall not be less than $25.00. (f) Installation charge. The charge for a city provided (underground or overhead) temporary electric pole will be determined by the utilities director or the director's designee. The charge for the city to inspect and tap up a customer provided temporary electric pole will be determined by the utilities director or the director's designee.

(Ord. No. 2015-338, § 1, 12-1-15; Ord. No. 2022-160, § 1, 6-7-22)

Ask a question about Dothan law

Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.