§ 114-213 — Permit required
Code of Ordinances of the City of Dothan, Alabama (Codified through Ordinance No. 2026-96, enacted April 21, 2026. (Supp. No. 67)) · Dothan Code of Ordinances § 114-213
Corpus is an independent public-information project, not the official City of Dothan website. Stable reference: corpuslaw.us/code/f2badd0e-c6b0-45d3-b4e3-99c08b7dce0a
Sec. 114-213. - Permit required.
Permanent signs require a permit and are to be located, placed, constructed, erected or modified on a lot or parcel as described on the permit application. (a) No new permit shall be issued until all signs on the site comply with the provisions of this article. (b) Applicability. No person shall erect, alter, relocate, repair, or change a sign without first obtaining a permit unless a permit is not required in accordance with section 114-211. (c) Permit contents. It shall be the applicant's responsibility to submit a complete application to the planning and development department on a form provided for that purpose signed by the property owner and/or sign owner and the sign contractor including all submission materials as described below. (d) Signs requiring electrical service, foundation work, etc. shall obtain a building permit conforming to the adopted building code and inspection requirements and the standards contained in this article. The building permit shall also be the sign permit. A permit application shall be required for each sign and accompanied by: (1) Payment in the amount of $50.00 per sign per trade inspection shall be made to the inspections services office when the permit is issued. (2) Two copies of a site plan, drawn to scale, indicating the location of all existing and proposed signs, both freestanding and wall-mounted relative to public right-of-way, lot lines, easements and buildings on the site. Design drawings for each sign including the dimension of any supporting structures including the maximum height of the sign as measured from finished grade. (3) Construction data shall be provided for signs exceeding a height of 20 feet including but not limited to; electrical load, wind load, anchorage or footing details certified by a registered engineer licensed to do business in the State of Alabama. The building official may require construction data for any sign. (4) Plans and specifications and methods of construction, electrical connections and attachment to the building or the ground for any freestanding sign or projecting sign. (5) Front façade with linear dimensions and calculation of sign size. (6) The type of illumination to be used. (7) A general description of materials to be used (metal, plastic, wood, etc.). (8) Any other data that the administrative official considers necessary to adequately review the application. (e) Signs not requiring electrical service, foundation work, etc., shall first obtain a sign permit conforming to the standards contained in this article. A permit application shall be required for each sign and accompanied by: (1) Payment in the amount of $25.00 shall be made when the sign permit application is submitted. (2) Two copies of a site plan, drawn to scale, indicating the location of all existing and proposed signs, both freestanding and wall-mounted relative to public right-of-way, lot lines, easements and buildings on the site. (3) Front façade with linear dimensions and calculation of sign size. (4) A general description of materials to be used (metal, plastic, wood, paint, etc.). (5) Any other data that the administrative official considers necessary to adequately review the application. (f) A placement permit is required for temporary signs as defined in section 114-220. There is no charge for a placement permit. Placement permits are required to establish the beginning and end dates that a temporary sign will be on display. Permit forms are available online and may be emailed or faxed to the planning and development office according to the instructions on the form. Placement permits are valid for 30 days prior to installation. (g) Procedures. Sign permits shall be processed as follows: (1) Complete applications shall be submitted to the department of planning and development for review. (2) The application shall be reviewed for conformance with these regulations and approved or denied based on the information provided. If denied, the applicable provisions of these regulations shall be specified. (3) A determination shall be given within five business days on a complete application. If a building permit is also required, the permit application shall be forwarded to the inspections services office for processing. The building permit shall also be the sign permit. (4) The permit shall be valid for 180 days after issuance.
(Ord. No. 2015-336, § 1, 12-1-15)
Ask a question about Dothan law
Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.