Sec. 42-67. - Duties and responsibilities of floodplain administrator.

The floodplain administrator and his/her designated staff is hereby authorized and directed to enforce the provisions of this article. The floodplain administrator is further authorized to render interpretations of this article, which are consistent with its spirit and purpose. The duties of the floodplain administrator under this article shall include, but not be limited to: (a) Require permits for all proposed construction or other development in the community, including the placement of manufactured homes, so that it may be determined whether such construction or other development is proposed within flood-prone areas. Ensure the public is aware that floodplain development permits are required for development in SFHAs. (b) Conduct regular inspections of the community's SFHAs for any unpermitted development and issue stop work orders and notice of violations for any such development. Any unpermitted structure or non-structural development in the SFHA will be considered a violation until such time that the violation has been remedied. (c) Review all permit applications of proposed development, to determine whether the proposed construction or other development will be reasonably safe from flooding and to assure compliance with this article. (1) If the provisions of this article have been met, approve the permit. (2) If the provisions of this article have not been met, request that either corrections and accurate completion of the application be made or disapprove the permit. (d) Review proposed development to assure that all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. § 1334. Maintain such permits permanently with floodplain development permit file. (e) Notify adjacent communities and the Alabama Department of Environmental Management and the appropriate district office of the U.S. Army Corps of Engineers prior to any alteration or relocation of a watercourse. Submit evidence of such notification to the Federal Emergency Management Agency (FEMA), and the NFIP State Coordinator's Office (Alabama Department of Economic and Community Affairs, Office of Water Resources). (f) For any altered or relocated watercourse, submit engineering data/analysis within six months after completion of the project to FEMA and state to ensure accuracy of community flood maps through the letter of map revision process. Assure flood carrying capacity of any altered or relocated watercourse is maintained following completion of the project. (g) Verify and record the actual elevation of the lowest floor, in relation to the mean sea level (or highest adjacent grade), of the regulatory floor, including basement, of all new or substantially improved residential structures, in accordance with subsection 42-69(b). (1) Review elevation certificates and require incomplete or incorrect certificates to be corrected and resubmitted for approval. (2) A post-construction elevation certificate is required to be kept with the permit and certificate of occupancy in perpetuity; a pre-construction elevation certificate can be used to ensure the correct elevation for the lowest floor and machinery along with the correct number of vents that will be used. (h) Verify and record the actual elevation, in relation to the mean sea level, to which any new or substantially improved nonresidential structures have been elevated or floodproofed, in accordance with subsection 42-69(b). (i) When floodproofing is utilized for a non-residential structure, the floodplain administrator shall obtain certification from a registered professional engineer, licensed to practice in the State of Alabama, or licensed architect, registered to practice in the State of Alabama, in accordance with subsection 42-97(b). (j) Where interpretation is needed as to the exact location of boundaries of the areas of SFHA (for example, where there appears to be a conflict between a mapped boundary and the actual field conditions), the floodplain administrator shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation, as provided in this article. (k) When base flood elevation data or floodway data have not been provided in accordance with section 42-33, the floodplain administrator shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source, in order to administer division 3 of this article. (l) All records pertaining to this article shall be maintained, in perpetuity, in the office of the floodplain administrator and shall be available for public inspection when requested. (m) In addition, the floodplain administrator and his or her designated staff is hereby authorized and directed to enforce the provisions of this article. The administrator is further authorized to render interpretations of this article, which are consistent with its spirit and purpose. (n) For any improvements made to existing construction located in the SFHA (as established in section 42-97 ensure that a permit is obtained. Also, conduct substantial improvement (SI) (as defined in section 42-26 of this article) reviews and analysis of all structural development permit applications. Maintain a record of the SI calculations and comments within the permit files in accordance with subsection 42-97(e) of this article. (o) For any residential and nonresidential structures located in the SFHAs that are damaged from any source, natural hazard or manmade, conduct substantial damage (SD) (as defined in section 42-26 of this article) assessments. (1) The floodplain administrator shall ensure that permits are obtained, in accordance with this article, prior to any repairs commencing. (2) The floodplain administrator should follow the procedures in its community substantial damage management plan to help enable the community to adequately manage the SI/SD determination process and the permitting and inspections for repairs during a post-disaster recovery. (3) Make SD determinations whenever structures within the SFHA area are damaged by any cause or origin. SD determinations shall not be waived to expedite the rebuilding process during a post-disaster recovery or for any other reason. (4) If the community has a large number of buildings in their SFHA that have been damaged, they should decide in advance how best to handle permitting and inspecting damaged buildings for substantial damage determinations. (5) If required, a moratorium may be placed on all non-disaster related construction permits until the community has sufficiently completed its SD determinations. (6) The SD determinations should be performed immediately after the damage-causing event or other cause of damage. (7) The community shall utilize methods and tools for collecting building data and performing analyses that will provide reasonable and defensible SD determinations. Those tools shall be capable of generating reports for record-keeping purposes and to provide to the applicable property owners if requested. (8) Maintain a record of the SD calculations within permit files in accordance with subsection 42-97(e) of this article. (9) If the SD determination finds that the extent that the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred, the floodplain administrator shall: a. Coordinate with the property owner and issue a letter to convey the SD determination. b. Determine if the damage was caused by flooding and include the cause in the letter to the property owner. Also, include whether or not the structure qualifies as a repetitive loss structure per the definitions in section 42-26 of this article. The information can be used to determine if the claim is eligible for an increased cost of compliance claim. c. Coordinate with property owners and insurance companies for any NFIP claims. d. If the repairs are to proceed, coordinate with the permit applicant to ensure a permit is obtained and inspections are conducted to ensure that all applicable provisions of this article are adhered to without exception or waiver. (10) A structure qualifies as a repetitively damaged structure (synonymous to repetitive loss property) if it's determined to have been damaged by flooding two or more times within a ten-year period where the cost of repairing the flood damage, on average, equaled or exceeded 25 percent of its market value at the time of each flood event. All of the provisions of subsection 42-67(l) for substantial damages shall apply to any repetitively damaged structure, whether it is covered by NFIP flood insurance or not. If the structure is located within a SFHA and NFIP flood insurance claims were paid for each of the two flood losses then the structure is eligible for an increased cost of compliance (ICC) claim. The following procedures shall be performed by the community to track repetitive losses and provide documentation necessary for an ICC claim: a. Maintain permit records of all reconstruction and repairs for flood damages; b. Record the date of repairs for a particular building so that the repair history can be checked before the next permit is issued; c. Record the flood-related cost to repair the building and the market value of the building before the damage occurred for each flood event; and d. Issue a letter of notice of determination to the owner of the structure. (11) Ensure that phased improvements and incremental repairs do not circumvent the SI/SD requirements. (12) Ensure that any combinations of elective improvements being made in addition to the necessary repairs to damages are included in making the SI/SD determination. (13) An applicant for a permit may appeal a decision, order, or determination that was made by the local official for the following: a. The local official's finding or determination that the proposed work constituting a SI/SD were based on insufficient information, errors, or repair/improvement costs that should be included and/or excluded; b. The local official's finding or determination that the proposed work constituting a SI/SD were based on inappropriate valuations of costs for the proposed work, or an inappropriate method to determine the market value of the building. (14) It is not appropriate for a permit applicant to seek an appeal who wishes to build in a manner that is contrary to the regulations and codes included in this article. In those cases, the applicant should seek a variance. (15) Ensure that any building located in a floodway that constitutes a SI/SD has an engineering analysis performed in accordance with subsection 42-97(e)(2). If that analysis indicates any increase in the BFE, the local official must not allow the proposed work unless the structure is brought into full compliance with this article. (p) Coordinate with insurance adjusters prior to permitting any proposed work to bring any flood-damaged structure covered by a standard flood insurance policy into compliance (either substantially damaged structures or repetitive loss structures) to ensure eligibility for ICC funds. (q) Right of entry. (1) After the certificate of occupancy has been issued for a building and the floodplain administrator observes or has reasonable cause to believe that renovations or retrofits have been made to the building, structure, or premises located in a SFHA that appear to be in violation of any provisions of this article, he/she shall have the right to seek entry into that building as described in [subsections] (2) to (5) below. (2) Whenever it becomes necessary to make an inspection to enforce any of the provisions of this article, the floodplain administrator may enter such building, structure or premises at all reasonable times to inspect the same or perform any duty imposed upon the floodplain administrator by this article. (3) If such building or premises are occupied, the floodplain administrator shall first present proper credentials and request entry. If such building, structure, or premises are unoccupied, he/she shall first make a reasonable effort to locate the owner or other persons having charge or control of such building or premises prior to entry. (4) If entry is refused, the floodplain administrator shall have recourse to every remedy provided by law to secure entry of the building, structure, or premises. (5) When the floodplain administrator shall have first obtained a proper inspection warrant or other remedy provided by law to secure entry, no owner or occupant or any other persons having charge, care or control of any building, structure, or premises shall fail or neglect, after proper request is made as herein provided, to promptly permit entry therein by the floodplain administrator for the purpose of inspection and examination pursuant to this article. (r) Stop work orders. (1) Upon notice from the floodplain administrator, work on any building, structure or premises that is being performed contrary to the provisions of this chapter shall immediately cease. (2) Such notice shall be in writing and shall be given to the owner of the property, or to his or her agent, or to the person doing the work, and shall state the conditions under which work may be resumed. (s) Revocation of permits. (1) The floodplain administrator may revoke a permit or approval, issued under the provisions of this chapter, in case there has been any false statement or misrepresentation as to the material fact in the application or plans on which the permit or approval was based. (2) The floodplain administrator may revoke a permit upon determination that the construction, erection, alteration, repair, moving, demolition, installation, or replacement of the structure for which the permit was issued is in violation of, or not in conformity with, the provisions of this chapter.

(Ord. No. 2024-8, § 1, 1-16-24)