§ 46-36 — Permit conditions
Code of Ordinances of the City of Dothan, Alabama (Codified through Ordinance No. 2026-96, enacted April 21, 2026. (Supp. No. 67)) · Dothan Code of Ordinances § 46-36
Corpus is an independent public-information project, not the official City of Dothan website. Stable reference: corpuslaw.us/code/3d538bd9-fea4-4f60-ba9b-e1894d5efb50
Sec. 46-36. - Permit conditions.
(a) Approval required. No permit shall be issued to dig, drill, bore, construct or enlarge any well for the withdrawal of water except upon the recommendation of the water and electric superintendent and the approval of the city manager. (b) Use as discharging point. It is unlawful and dangerous to the public health for any well within the city to be employed as a discharge point for any waste of any kind: liquid, inorganic or organic. (c) Industrial plants. Industrial plants using wells for industrial water and water from the city distribution system for human use and consumption, shall, in addition to maintaining complete physical separation of the two supplies, properly identify all pipes carrying the industrial supply, as approved by the water superintendent. (d) Removal from city distribution system. If any private well system is not in compliance with this article, the water superintendent is empowered and directed to disconnect and remove in an appropriate manner the property served by the well system from the city distribution system. (e) Covering and screening of wells and cisterns. The owner or proprietor of any lot or parcel of ground within the city, upon which is located a well or cistern, shall be required to keep such well or cistern securely covered for the protection of anyone coming upon the property and to protect from surface water and contamination. Such covering shall be of concrete or other sanitary material, subject to the approval of the water superintendent. However, the covering and protection required in this subsection shall not be construed to prevent the owner or proprietor from maintaining a sufficient opening through which to draw, pump or otherwise remove water from such well or cistern. Such opening is to be screened or covered so as to prevent the entrance of mosquitoes. (f) Filling dangerous wells. When, in the opinion of the water superintendent, a private well system fails to meet any of the conditions set out in this article or if it is so poorly maintained and protected as to allow a danger to animals and children and is further considered to be a menace to public health, the well shall be ordered to be filled in a manner approved by the health officer and the city engineer, in accordance with the state department of environmental management regulations. (g) Abandoned wells. It shall be unlawful for any person owning or having control over any parcel of real property within the corporate limits upon which the parcel of real property is located any abandoned well to allow or permit the well to remain open. It shall be the duty of any such person who owns or has control over such property to completely and adequately seal such abandoned well in such a manner that there will be no danger from the abandoned well to any person who may come upon the property, whether their entry upon the property is lawful or otherwise. (h) Bond required of persons engaged in business of well construction. It shall be the duty of every person licensed to engage in the business of digging, drilling, boring, constructing or enlarging any well used or to be used for the withdrawal or securing of water in the city to be bonded by the state in accordance with the Rules, Regulations, and Standards and Rules of Practice and Procedure adopted by the Alabama Water Well Standards Board on October 12, 1972, and amended on March 8, 1974, and July 18, 1978, in accordance with Code of Ala. 1975, § 22-24-1 et seq. (i) Reports. Any person who engages in the digging, drilling, boring, constructing or enlarging of any well in the city shall maintain complete legible and neat logs of each permanent well. A report shall be forwarded to the water department within 30 days of completion of the well or completion of the work on the well in accordance with requirements of state regulations in subsection (h) of this section.
(Code 1977, § 11-10)
Ask a question about Dothan law
Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.
