Sec. 15-113. - Grease control program requirements.
(a) Permit required for food service facilities; program fees. In order to operate within the city, each user must apply for and obtain a grease control program permit or exemption therefrom. Existing food service facilities must apply for a permit within sixty (60) days from the effective date of this division. No permit fee shall be assessed to permit applicants. Applicants with more than one food service facility shall obtain a permit for each food service facility. Permits are issued on a calendar year basis and must be renewed by the applicant on an annual basis between January 1 and March 1. A food service facility shall not conduct business without a current permit. The city reserves the right to non-renew a permit in the event of non-compliance by a permittee with the terms of this division and/or with any permit conditions. Permits are non-transferable. A new permit is required for a change of ownership or location. To obtain a permit, an applicant must obtain a permit application from the city's engineering department and fully complete such application. Applicants must sign permit application to certify that the information contained therein is true, accurate and complete prior to submitting the application for review. The submission of untruthful, inaccurate or incomplete information on a permit application may result in denial of such application, revocation of an existing permit, and/or disconnection of an applicant or permittee from the city's sewer system. Program applications shall be returned to the city's engineering department. Within thirty (30) calendar days of receipt thereof, the city's engineering department shall evaluate such permit application, inspect all grease control devices within the food service facility for which permitting is sought, and notify the applicant of the city's acceptance or denial of the applicants' permit application. If the applicant's grease control devices meet the requirements set forth in this division, then the official shall issue a permit. If the existing food service facility's grease control devices do not meet the requirements set forth in this division, the official may deny the permit application or may issue the permit under the condition that certain upgrades to the food service facility are to be completed for proper compliance with this division. A schedule for completion of the required upgrades shall also be included on the permit. The applicant will be given a maximum of one year from the date of permit issuance to complete the required upgrades. A re-inspection fee of two hundred dollars ($200.00) per grease control device shall be assessed to an applicant or permittee by the city each time a food service facility fails an inspection of such device by the official and must be re-inspected. The non-payment of any re-inspection fee by an applicant or permittee is deemed a violation of this division. The official will evaluate program fees periodically and may request that the city council adjust such fees, if necessary, based on the cost of operation of the program. The issuance of a permit shall not excuse the applicant and/or food service facility from the need to obtain other required state and local permits or licenses. (b) Permit conditions. The official may place conditions on the issuance of a permit as required to ensure compliance with the provisions of this division as well as the intent of this program. Such conditions may include, but are not limited to, the following: (1) Frequency of inspections; (2) Maintenance requirements; (3) Compliance schedule; (4) Requirements for retaining records; (5) Permittee's statement of permission for the official and/or other duly authorized employee of the city to enter upon the permittee/user's property without prior notification for the purpose of inspection, observation, photography, records examinations, records copying, measurement, and sampling or testing to determine compliance with this division; and/or (6) Other conditions deemed by the official necessary to ensure compliance with the intent of this program and other applicable ordinances, laws and regulations of the city, state or federal government. (c) Permit denial; appeal. Within thirty (30) calendar days of a decision to deny a permit application, the official shall notify the applicant in writing of the specific cause for the denial. The applicant who is denied a permit under this program shall have the right to appeal such denial to the Hoover Code Appeals Board. The appeal shall be filed in writing by the applicant with the official within seven (7) days of receipt of the notice of denial from the official. Thereafter, a hearing on the appeal before the Hoover Code Appeals Board shall take place within ten (10) days from the date of receipt of the notice of appeal. The decision of the Hoover Code Appeals Board shall be final. (d) Exemption from permit requirement. Food service facilities not otherwise excluded herein and which do not discharge FOG into a sanitary sewer system may request an exemption from the permit requirement set forth in this division. To obtain an exemption, food service facilities must follow the application process set forth in subsection (a) of this section. Applications for which an exemption is requested are not subject to any application fee stated in subsection (a) of this section. Following inspection, the official will determine whether the applicant is entitled to an exemption and issue such exemption accordingly. In the event that a food service facility is not granted an exemption hereunder, then the applicant shall be required to follow the application process set forth in this section 15-113 herein. Any exemption granted will remain in effect indefinitely until such time as there is a change in food service operations within the exempt food service facility which results in the generation of FOG into a sanitary sewer system. Food service facilities which are granted an exemption from the permit requirement remain subject to inspection by the city and are required to notify the official if changes are made to the food service facility which results in the generation of FOG into a sanitary sewer system. The failure to notify the official of such FOG generation shall be considered a violation of this division.
(Ord. No. 10-2198, § 1, 11-15-10)
Ask a question about Hoover law
Corpus searches the Hoover sections it holds and shows the ones that match, with their citations. Free, no sign-in.