§ 15-78 — Compliance schedule and reporting requirements

Code of Ordinances of the City of Hoover, Alabama (Supplement 23, published 2025-05-19 (Municode online 2026-03-30).) · Hoover Municipal Code § 15-78

Corpus is an independent public-information project, not the official City of Hoover website. Stable reference: corpuslaw.us/code/54455b12-c07b-4b8b-b9ea-8aabdc247655

Sec. 15-78. - Compliance schedule and reporting requirements.

The following conditions shall apply to the requirements enumerated by sections 15-73 and 15-75 of this division. (1) The schedule shall contain increments of progress in the form of calendar dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment requirements for the industrial user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc). (2) No increment referred to in subsection (1), above, shall exceed nine (9) months. (3) Not later than fourteen (14) days following each date in the schedule and the final date for compliance, the industrial user shall submit a progress report to the city and the ADEM including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for the delay and steps being taken by the industrial user to return the construction to the schedule established. In no event shall more than nine (9) months elapse between such progress reports to the city and the ADEM. (4) Within ninety (90) days following the date for final compliance with applicable pretreatment standards or, in the case of a new source, prior to commencement of the introduction of wastewater into the sewer system, any industrial user subject to pretreatment standards and requirements shall submit to the city and the ADEM a report indicating the nature and concentration of all pollutants in the discharge from the regulated process which are limited by pretreatment standards and requirements and the average and maximum daily flow for those process units which are regulated by such pretreatment standards or requirements. The report shall state whether the applicable pretreatment standards or requirements are being met on a consistent basis and, if not, what additional operation and maintenance procedure or pretreatment is necessary to bring the industrial user into compliance with the applicable pretreatment standards or requirements. This statement shall be signed by an authorized representative of the industrial user as defined in section 15-17 and certified to by a qualified professional engineer registered in the State of Alabama. (5) a. Any industrial user subject to a pretreatment standard, after the compliance date of such pretreatment standard, or, in the case of a new source, after commencement of the discharge into the sewer system, shall submit to the city and the ADEM during the months of June and December, unless required more frequently in the pretreatment standard or by the city and the ADEM, a report indicating the nature and concentration of pollutants in the effluent which are limited by such pretreatment standard. In addition, this report shall include a record of all daily flows which during the reporting period exceed the average daily flow reported in section 15-73(4) of this division. At the discretion of the city and the ADEM and in consideration of such factors as local high or low flow rates, holidays, budget cycles, etc., the city and the ADEM may agree to alter the months during which the above reports are to be submitted. b. The city and ADEM, as applicable, may impose mass limitations on industrial users which are using dilution to meet applicable pretreatment standards or requirements or in other cases where the imposition of mass limitations are appropriate. In such cases, the report required by subparagraph (a) of this paragraph shall indicate the mass of pollutants regulated by pretreatment standards in the effluent of the industrial user. (6) The industrial user shall immediately notify the city of any such discharge as defined by section 15-31 by calling (205) 325-5139 or 428-2614. (7) The reports required in this division shall contain the results of sampling and analysis of the discharge, including the flow and the nature and concentration, or production and mass limits where requested by the city and the ADEM, of pollutants contained herein which are limited by the applicable pretreatment standards. The frequency of monitoring shall be prescribed in the applicable pretreatment standard. All analyses shall be performed in accordance with procedures established by the Environmental Protection Agency under the provisions of Section 304(h) of the Act (33 U.S.C. 1314(h)) and contained in 40 CFR Part 136 and amendments thereto or with any other test procedures approved by the Environmental Protection Agency or the ADEM. Sampling shall be performed in accordance with the techniques approved by the Environmental Protection Agency.

(Ord. No. 88-714, Art. IV, § H, 4-18-88)

Ask a question about Hoover law

Corpus searches the Hoover sections it holds and shows the ones that match, with their citations. Free, no sign-in.