For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21-40 — New sewer lines

Code of Ordinances of the City of Huntsville, Alabama (Supp. No. 30 (codified through Ord. No. 26-196, adopted March 12, 2026) with enacted ordinances through Ord. No. 26-837 (September 24, 2026) applied from official council minutes and ordinance copies) · Huntsville Code of Ordinances § 21-40

Corpus is an independent public-information project, not the official City of Huntsville website. Stable reference: corpuslaw.us/code/577f4657-b2c1-4f67-983c-41fd8f9c7661

Sec. 21-40. - New sewer lines.

(a) No person shall construct or lay sewer lines in any subdivision of the city, or in any easements or public rights-of-way of the city, where public sewers are not existing or located, without first presenting plans and specifications for the laying of such sewers to the city council or its duly designated agent and obtaining the consent for the laying of such sewer lines. A copy of such plans and specifications shall be left on file with the engineering division. (b) The engineering division is designated the lawful agent of the city to receive and approve such plans and specifications. (c) Physical location for grinder pumps shall be forward of the rear wall of the main building but shall in no case be obstructed by shrubbery, fences or any other object which would prevent clear access or visibility from the public street. (d) The installation and use of individual sewer systems requiring grinder pumps shall be permitted provided that all provisions set forth in this article are complied with. (e) The developer or person in control of any subdivision of the city who is permitted to install any sewer system utilizing grinder pumps shall be required to provide at no cost to the city, and before the actual installation begins, an inventory of replacement parts in an amount equal to ten percent of the total number of grinder pump units to be installed and shall consist of the following: complete simplex grinder pumps, pump O-rings, pump seals, pump gaskets, grinder pump impellers, pump shredding rings, complete float assemblies, float brackets, complete junction boxes, complete simplex control panels, control panel circuit breakers, control panel overloads, control panel run caps, control panel start relay, control panel start caps, control panel contractors, control panel run lights, and any other parts as recommended by the equipment manufacturer.

(Code 1982, § 20-111; Ord. No. 87-167, § 1, 5-14-1987)

Ask a question about Huntsville law

Corpus searches the Huntsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.