§ 17-4 — Duties and responsibilities of the city engineer
Code of the City of Mobile, Alabama (Supp. No. 67: codified through Ordinance No. 36-017-2026, adopted March 1, 2026) · Mobile City Code § 17-4
Corpus is an independent public-information project, not the official City of Mobile website. Stable reference: corpuslaw.us/code/9734bdae-6771-4cab-a2b2-003dd8ef9b84
Sec. 17-4. - Duties and responsibilities of the city engineer.
(a) The city engineer may furnish additional policy, criteria and information for proper implementation of this division through the city floodplain management plan (copy available on city website) or a stormwater design manual (see subsection 17-1(c)), which may be amended from time to time as needed. (b) The city engineer may waive the requirements of this division under subsection 17-9(d), herein, but any such waivers shall not be construed as relieving the party responsible for the identified activity from making on-site drainage improvements required under this chapter for stormwater management. (c) The city engineer is authorized to administer this chapter, including, but not limited to the following: (1) Review copies of all necessary permits from governmental agencies from which approval is required by Federal or State law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Maintain such permits permanently with floodplain development permit file. The responsibility for acquiring all permits remains with the owner/developer. (2) When base flood elevation data or floodway data have not been provided in accordance with section 17-22, then the city engineer shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source, in order to administer the provisions of sections 17-25 through 17-29. (3) Notify adjacent communities and the state department of natural resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA), and the state department of economic and community affairs/office of water resources/NFIP state coordinator's office. (4) For any altered or relocated watercourse, submit engineering data/analysis within six (6) months to FEMA and state to ensure accuracy of community flood maps through the letter of map revision process. Assure flood carrying capacity of any altered or relocated watercourse is maintained. (5) Where interpretation is needed as to the exact location of the boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the city engineer shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this chapter. (6) Where interpretation is needed as to the exact requirements of flood-proofing, the city engineer shall make the necessary interpretation. Any person contesting the interpretation shall be given reasonable opportunity to appeal the interpretation as provided in this chapter.
(Ord. No. 17-013-2020, 5-19-20)
Ask a question about Mobile law
Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.
