Sec. 57-122. - Specifications.
All construction work on driveways across the curb or sidewalk shall be done in conformity with the city standard specifications for sidewalks and driveways prepared by the city engineer, which standard specifications are as follows: (1) Permit for construction of a sidewalk or driveway shall be secured from the city engineer's office before work is started and the work shall be done in conformity to the direction of the authorized assistant of the city engineer. Minimum widths of sidewalks shall be four (4) feet and minimum depths three and three-quarters (3¾) inches. (The city reserves the right to alter specifications to meet unusual physical conditions that may be encountered.) (2) All walks shall be placed adjoining property lines and on the grades established by the city and shall be sloped one-quarter inch to the foot. The subgrade shall be thoroughly compacted and have a slope in conformity with the finished surface. (3) Concrete shall be a mixture of 1.00 part cement 2.25 parts sand 3.25 parts gravel using not over six (6) gallons of water to each bag of cement. (4) All forms shall be rigid and straight. (5) After the concrete has been placed and tamped, it shall be brought to the established grade by means of a strike board. It will then be worked with a wood float in a manner which will thoroughly compact it and provide a surface free from depression or irregularities of any kind. In no case shall dry cement and sand be sprinkled on the surface. (6) The surface edges of all slopes shall be rounded to a radius of one-half inch. The pavement shall be divided into blocks approximately the same width as the walk by means of a jointer or groover. (7) Transverse expansion joints shall be made at intervals of about thirty (30) feet and shall extend from the surface to the bottom of the sidewalk and shall be one-half inch in width and filled with joint filler. All protruding expansion joints shall be cut flush with the sidewalk. (8) After floating has been completed, the surface shall be lightly brushed transversely with a soft brush or preferably finished with a cork float so as to leave a nonskid surface. (9) As soon as the finished work has hardened sufficiently to prevent damage, the surface of the walk shall be sprinkled with clean water and kept wet for at least seventy-two (72) hours. Curing by application of chemicals or some other method may be used upon the approval of the engineer or his authorized assistant. (10) Work shall be protected by the erection and maintenance of suitable barricades to protect the walk from traffic and shall not be opened to traffic until the prescribed curing period has expired. (11) All driveway entrances shall be constructed in conformity in all respects to the above specifications and shall have a minimum radius of at least three (3) feet at the curb, and the depth of the paving of the driveway apron and walk joining the entrance apron shall have a minimum depth of at least five (5) inches. (12) All provisions of this Code and other ordinances as to barricading, lighting, etc., shall be strictly obeyed. (13) If the work is done by contract, the contractor shall have a city sidewalk contract license.
(Code 1965, § 55-56)
Ask a question about Mobile law
Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.